Valid

GB 50819-2013Code for construction of oil and gas field gathering and transmission pipeline (English PDF)

油气田集输管道施工规范

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for GB 50819-2013 in 30 minutes.

Issued by

State Administration for Market Regulation; Standardization Administration of China

Level / Type

National · Mandatory

Issue date

January 1, 2013

Implementation date

January 1, 2013

Scope

GB 50819-2013 is the English-translated version of 油气田集输管道施工规范.

GB 50819-2013 is the Chinese standard "Code for construction of oil and gas field gathering and transmission pipeline".

Found what you need?

Document preview — GB 50819-2013

National Standard of the People's Republic of China

ICS
75.010

Contents

  • [Preview only]
  • 1 General provisions
  • 2 Normative references
  • 3 Classification and labeling
  • 3.1 Product Varieties
  • 3.2 Product Marks
  • 3.3 Transportation process of products pipeline
  • 3.4 Transportation process of liquefied petroleum gas (LPG) pipeline
  • 4 Requirements and test methods
  • 4.1 Pipeline route selection
  • 4.2 Laying
  • 4.3 External corrosion control and thermal insulation
  • 4.4 Pipeline block valve
  • 4.5 Anchoring
  • 4.6 Marking
  • 4.7 Hydraulic protection for pipelines
  • 5 Inspection rules
  • 5.1 Inspection types and test items
  • 5.2 Batching
  • 5.3 Sampling
  • 5.4 Determination rules
  • 5.5 Retest rules
  • 5.6 Stiffness and stability of pipeline
  • 5.7 Powder and Aggregate Silo
  • 5.8 Frame, Pipe Support and Pipeline
  • 5.9 Cooling Tower
  • 6 Marking, packaging, transportation and storage
  • 6.1 Site selection and general layout
  • 6.2 Process of station
  • 6.3 Process and equipment of crude oil pipeline station
  • 6.4 Process and equipment of products pipeline stations
  • 6.5 Process and equipment of LPG pipeline stations
  • 6.6 Corrosion prevention and thermal insulation for pipelines and equipment in the station
  • 6.7 Power supply and distribution of the station
  • 6.8 Water supply, drainage and fire protection of the station
  • 6.9 Heating, ventilation and air conditioning
  • 7 Monitoring system of pipelines
  • 7.1 General
  • 7.2 Control center and computer system
  • 7.3 Station control system
  • 7.4 Inspection and Acceptance of Weld Joint
  • 8 Telecommunication
  • 8.1 Ditching
  • 8.2 Lowering-in
  • 8.3 Ditch Backfilling
  • 9 Welding, inspection, and pressure test of pipeline
  • 9.1 Welding and inspection
  • 9.2 Pressure test
  • 9.3 Test on Strength and Tightness
  • 9.4 Drying

1 Foreword

GB 50819-2013 was issued by State Administration for Market Regulation; Standardization Administration of China on 25 December 2012.

The GB prefix, without a suffix, marks a mandatory standard: within its scope, compliance is required.

The document runs to 15 pages in English translation.

2 Scope Preview

GB 50819-2013 falls under ICS 75.010, in the field of petroleum and related technologies.

This catalogue holds 78 other GB standards in that field.

In this catalogue, GB standards carry edition years from 1963 to 2026.

3 About this standard

Issued by: State Administration for Market Regulation; Standardization Administration of China

English translation: about 15 pages (approximate)

4 Classification and status

International classification (ICS): 75.010

Chinese Standard Classification (CCS): P 71

Prefix GB: mandatory standard.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

How to Download GB 50819-2013

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Fast delivery

    After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Fast delivery
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB 50819-2013

$1,100.00