Valid

GB 50542-2009Technical Code for Pipelines Coordination in Petrochemical Plant (English PDF)

石油化工厂区管线综合技术规范

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for GB 50542-2009 in 30 minutes.

Issued by

State Administration for Market Regulation; Standardization Administration of China

Level / Type

National · Mandatory

Issue date

November 11, 2009

Implementation date

November 11, 2009

Scope

GB 50542-2009 is the English-translated version of 石油化工厂区管线综合技术规范.

GB 50542-2009 is the Chinese standard "Technical Code for Pipelines Coordination in Petrochemical Plant". Issued on 2009-11-11.

Found what you need?

Document preview — GB 50542-2009

Contents

  • [Preview only]
  • 1 General Provisions
  • 2 Terms
  • 2.2 Symbols
  • 3 General Requirements
  • 4 Designs of Pipelines Coordination above Ground
  • 5 Designs of Pipelines Coordination Underground
  • 6 Compiling the Design Diagram of Pipelines Coordination
  • 7 Construction of Pipeline
  • 8 Detecting the Underground Pipline
  • 9 Surveying the Underground Pipeline

1 Foreword

GB 50542-2009 was issued by State Administration for Market Regulation; Standardization Administration of China on 11 November 2009.

1.0.1 This code was formulated in order to unify the technical repuirements for the planning, design and construction of pipelines coordination and the general survey of underground pipelines in petrochemical plant and to achieve reasonable layout, safety and reliablity, advanced technology, economic feasibility and convenient management.

1.0.2 This code applies to the planning, design and construction the coordination of pipelines in those constructed, renovated or extended systematic public works with those process pipelines, the underground pipeline exploration (detecting and surveying) and the establishment and application of the information management system for pipelines coordination in petrochemical plant, as well as the pipelines coordination in the oil and gas field and the station yard of oil gas transmission project.But it does not apply to the design and construction of pipelines coordination in process devices, system unit, and facilities for storage and transportation.

1.0.3 This code specifies the basic technical repuirements for the pipelines coordination in petrochemical plant. And the pipelines coordination shall be implemented according to the requirements of the national laws and administrative regulations if this code conflicts with the requirements of the relevant national laws and administrative regulations.

1.0.4 The planning, design, and construction of pipelines coordination, the underground pipeline exploration (detecting and surveying) as well as the establishment and application of information management system for pipelines in petrochemical plant not only shall implement this code, but also shall be in accordance with those specified in the current relevant national standards.

2 Scope Preview

GB 50542-2009 carries no ICS number and no Chinese Standard Classification code.

This catalogue holds 12,418 other GB standards.

Of the 4,081 GB standards that do carry an ICS number, 849 (21%) fall under ICS 13, in the field of environment and health protection, safety.

3 About this standard

Issued by: State Administration for Market Regulation; Standardization Administration of China

English translation: about 15 pages (approximate)

4 Classification and status

Prefix GB: mandatory standard.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

How to Download GB 50542-2009

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Fast delivery

    After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Fast delivery
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB 50542-2009

$500.00