Valid

GB 50465-2008Code for general planning of mining area of coal industry (English PDF)

煤炭工业矿区总体规划规范

Preview PDF

This is a limited preview

Buy now to download the full PDF (81 pages)

Need quotation for your management?

Get a formal quotation for GB 50465-2008 in 30 minutes.

Issued by

Ministry of Housing and Urban-Rural Development of the People's Republic of China; General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China

Level / Type

National · Mandatory

Issue date

December 15, 2008

Implementation date

August 1, 2009

Scope

GB 50465-2008 is the English-translated version of 煤炭工业矿区总体规划规范.

GB 50465-2008 — This Chinese standard applies to the coal mining industry in the overall planning. Mining of coal mine resource development master plan should be prepared.

Mine accredited master plan should be filed in the mining resources survey and the necessary detailed investigation on the basis of geological reports. Well for determining mine (mine) field division, the scale of construction and coal utilization direction of the main exploration area should reach the level of detailed investigation.

For reach wells (mine) field delineation of the exploration area should be required to make further supplementary exploration opinions.

Found what you need?

Document preview — GB 50465-2008

National Standard of the People's Republic of China

ICS
73
Classification
P 70

Issued by: Ministry of Housing and Urban-Rural Development of the People's Republic of China; General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China

Contents

  • What this standard covers1
  • Document data2

What this standard covers

This Chinese standard applies to the coal mining industry in the overall planning. Mining of coal mine resource development master plan should be prepared. Mine accredited master plan should be filed in the mining resources survey and the necessary detailed investigation on the basis of geological reports. Well for determining mine (mine) field division, the scale of construction and coal utilization direction of the main exploration area should reach the level of detailed investigation. For reach wells (mine) field delineation of the exploration area should be required to make further supplementary exploration opinions. Coal mine planning, in addition to compliance with this criterion, there should be consistent with existing national standards.

Document data

International classification (ICS): 73.

Chinese classification (CCS): P70.

Estimated length of the Chinese original: 123,158 words.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 81 pages — is available in the English PDF.

How to Download GB 50465-2008

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
81 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB 50465-2008

$2,509.00