GB 50443-2007Code for design of energy conservation of cement plant (English PDF)

水泥工厂节能设计规范

Preview PDF

GB 50443 | Evolution and historical versions

Std IDTitleStatus
GB 50443-2016Code for design of energy conservation of cement plantValid
GB 50443-2007Code for design of energy conservation of cement plantObsolete

GB 50443-2007 is obsolete. It has been replaced by GB 50443-2016. This page sells the obsolete edition, for projects and contracts that still cite it.

This is a limited preview

Buy now to download the full PDF

Need quotation for your management?

Get a formal quotation for GB 50443-2007 in 30 minutes.

Issued by

MOC

Level / Type

National · Mandatory

Issue date

October 25, 2007

Implementation date

May 1, 2008

Scope

GB 50443-2007 is the English-translated version of 水泥工厂节能设计规范.

GB 50443-2007 is the Chinese national standard "Code for design of energy conservation of cement plant". It was issued on October 25, 2007 by MOC, and took effect on May 1, 2008. It is obsolete: it has been replaced by GB 50443-2016.

Found what you need?

Document preview — GB 50443-2007

National Standard of the People's Republic of China

Issued by: MOC

Contents

  • Document data
1 Document data

Sector: National standard (Mandatory).

Issuing body: MOC.

Date of issue: 2007-10-25.

Date of implementation: 2008-05-01.

Status: obsolete, replaced by GB 50443-2016.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.

Referenced standards

How to Download GB 50443-2007

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Fast delivery

    After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
Fast delivery
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB 50443-2007

$105.00