GB 50433-2008Technical code on soil and water conservation of development and construction projects (English PDF)

开发建设项目水土保持技术规范

Preview PDF

GB 50433 | Evolution and historical versions

Std IDTitleStatus
GB 50433-2018Technical standard of soil and water conservation for production and construction projectsValid
GB 50433-2008Technical code on soil and water conservation of development and construction projectsObsolete

GB 50433-2008 is obsolete. It has been replaced by GB 50433-2018. This page sells the obsolete edition, for projects and contracts that still cite it.

This is a limited preview

Buy now to download the full PDF

Need quotation for your management?

Get a formal quotation for GB 50433-2008 in 30 minutes.

Issued by

MOC

Level / Type

National · Mandatory

Issue date

January 14, 2008

Implementation date

July 1, 2008

Scope

GB 50433-2008 is the English-translated version of 开发建设项目水土保持技术规范.

GB 50433-2008 is the Chinese national standard "Technical code on soil and water conservation of development and construction projects". It was issued on January 14, 2008 by MOC, and took effect on July 1, 2008. It is obsolete: it has been replaced by GB 50433-2018.

Found what you need?

Document preview — GB 50433-2008

National Standard of the People's Republic of China

Issued by: MOC

Contents

  • Document data
1 Document data

Sector: National standard (Mandatory).

Issuing body: MOC.

Date of issue: 2008-01-14.

Date of implementation: 2008-07-01.

Status: obsolete, replaced by GB 50433-2018.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.

Referenced standards

How to Download GB 50433-2008

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB 50433-2008

$525.00