Scope
GB 25029-2010 (Steel slag cement for road) is available as an English-translated PDF.
GB 25029-2010 is the Chinese standard "Steel slag cement for road". Its scope clause reads: This standard specifies the definition, composition and material, strength grade, technical requirements, test methods, inspection rules, packaging, marking, transportation and storage of steel slag cement for road.
This standard applies to steel slag cement for road. Its clauses include strength grade; technical requirements; inspection rules; packaging, marking, transportation and storage.
It was issued by the General Administration of Quality Supervision, Inspection and Quarantine of PRC on 2010-09-02 and took effect on 2011-07-01.
Found what you need?
Document preview — GB 25029-2010
National Standard of the People's Republic of China
- ICS
- 91.100.10
- Classification
- Q 11
Issued by: General Administration of Quality Supervision, Inspection and Quarantine of PRC
Contents
- Foreword...3
- 1 Scope...4
- 2 Normative references...4
- 3 Terms and definitions...5
- 4 Components and materials...5
- 5 Strength grade...6
- 6 Technical requirements...6
- 7 Test method...7
- 8 Inspection rules...8
- 9 Packaging, marking, transportation and storage...10
1 Scope
This standard specifies the definition, composition and material, strength grade, technical requirements, test methods, inspection rules, packaging, marking, transportation and storage of steel slag cement for road.
This standard applies to steel slag cement for road.
2 Normative references
The provisions in following documents become the provisions of this Standard through reference in this Standard. For the dated references, the subsequent amendments (excluding corrections) or revisions do not apply to this Standard;
however, parties who reach an agreement based on this Standard are encouraged to study if the latest versions of these documents are applicable.
For undated references, the latest edition of the referenced document applies.
GB/T 176 Methods for chemical analysis of cement
GB/T 203 Granulated blast furnace slag used for cement production
GB/T 750 Method for soundness of Portland cement
GB/T 1346 Test methods for water requirement of normal consistency, setting time and soundness of the Portland cement (GB/T 1346-2001, eqv
ISO 9597:1989)
GB/T 5483 Natural gypsum
GB/T 8074 Testing method for specific surface of cement - Blaine method
GB 9774 Sacks for packing cement
GB/T 12573 Sampling method for cement
GB/T 12960 Quantitative determination of constituents of cement
GB 13693 Portland cement for road
GB/T 17671 Method of testing cements - Determination of strength (ISO method) (GB/T 17671-1999, idt ISO 679:1989)
4.4 Granulated blast furnace slag
Granulated blast furnace slag meeting the requirements of GB/T 203.
4.5 Granulated blast furnace slag powder
Granulated blast furnace slag powder that meets the requirements of GB/T
18046.
4.6 Road Portland cement clinker
Road Portland cement clinker that meets the requirements of GB 13693.
4.7 Plaster
4.7.1 Natural gypsum: Gypsum or mixed gypsum that shall conform to category
G or category M grade 2 (inclusive) or higher as specified in GB/T 5483.
4.7.2 Industrial by-product gypsum: It shall meet the industrial by-product gypsum specified in GB/T 21371.
4.8 Grinding aid
Grinding aids are allowed to be added during cement grinding; the addition amount shall not exceed 0.5% of the cement mass. The grinding aids shall meet the requirements of JC/T 667.
5 Strength grade
The strength grade of steel slag cement for road is divided into grades 32.5 and
42.5.
6 Technical requirements
6.1 Sulfur trioxide
The sulfur trioxide content (mass fraction) shall not exceed 4.0%.
6.2 Setting time
The initial setting time is not less than 90 min; the final setting time is not more than 600 min.
6.3 Stability
The stability test adopts the autoclave method; the autoclave expansion rate shall not be greater than 0.50%.
producer shall check the cement components at least monthly, the annual average shall meet the requirements of 4.1, the single inspection value shall not exceed 2% of the maximum limit specified in this standard.
In order to ensure the accuracy of the component determination results, the manufacturer shall adopt appropriate production procedures and appropriate methods to verify the reliability of the selected method; document the verified method.
7.2 Sulfur trioxide (SO3), chloride ion, sodium oxide (Na2O), potassium
oxide (K2O) content
Test according to GB/T 176.
7.3 Specific surface area
Test according to GB/T 8074.
7.4 Water consumption and setting time for standard consistency
Test according to GB/T 1346.
7.5 Steaming stability
Test according to GB/T 750.
7.6 Dry shrinkage rate
Test according to JC/T 603.
7.7 Abrasion resistance
Test according to JC/T 421.
7.8 Strength
Test according to GB/T17671.
8 Inspection rules
8.1 Numbering and sampling
Cement is numbered and sampled according to the same type and grade before leaving the factory. Bagged cement and bulk cement shall be numbered and sampled separately. Each number is a sampling unit; the cement’s exit-factory number is based on the annual output of steel slag cement for road:
Above 100000 t but not more than 400 t is a number; less than 100000 t but not shall be agreed upon by the buyer and the seller and shall be indicated in the contract or agreement. The seller has the responsibility to inform the buyer of the acceptance method. When there is no written contract or agreement, or the method of acceptance is not indicated in the contract or agreement, the seller shall indicate the words "use the cement inspection report of the same number as the basis for acceptance" on the invoice.
8.6.2 When taking the inspection result of the physical specimen as the basis
for acceptance, the buyer and the seller shall jointly take the sample and sign
& seal it before shipment or the place of delivery. The sampling method is carried out according to GB 12573, the sampling quantity is 28 kg, which is reduced into two equal parts. One part shall be kept by the seller for 40 days, the other part shall be inspected by the buyer according to the items and methods specified in this standard.
Within 40 days, if the buyer considers that the quality of the product does not meet the requirements of this standard, whilst the seller has objections, both parties shall send another specimen kept by the seller to a national cement quality supervision and inspection agency as recognized by the province or above for arbitration inspection. The arbitration inspection of cement stability shall be completed within 10 days from the date of sampling.
8.6.3 When the manufacturer’s inspection report of the cement with the same
number is used as the basis for acceptance, the buyer will sample the cement with the same number before shipment or at the time of delivery. The both parties shall sign-seal it and the seller retains it for 90 days; or otherwise it recognizes the seller’s sampling, or the retained sample from the cement of same number which was sign-sealed and kept for 90 d.
Within 90 days, when the buyer has doubts about the quality of cement, the buyer and the seller will send the jointly approved samples to a national cement quality supervision and inspection agency recognized by the province or above for arbitration inspection.
9 Packaging, marking, transportation and storage
9.1 Packaging
Cement can be packed in bags or in bulk. The net content of each bag of bagged cement is 50 kg, which shall not be less than 99% of the marked mass;
the total mass (including packaging bags) of 20 bags randomly selected shall not be less than 1000 kg. Other packaging forms are determined through negotiation between the supplier and the buyer, but the relevant bag mass requirements must comply with the above principles. The cement packaging bag shall meet the requirements of GB 9774.
......
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 10 pages — is available in the English PDF.
Referenced standards
Normative references
- GB/T 176Methods for chemical analysis of cement
- GB/T 203Granulated blast furnace slag used for cement production
- GB/T 750Test method for autoclave expansion of cement
- GB/T 1346Test methods for water requirement of standard consistency, setting time and soundness of the Portland cement
- GB/T 5483Natural gypsum
- GB/T 8074Testing method for specific surface of cement - Blaine method
ISO 9597 · GB 9774 · GB 13693
How to Download GB 25029-2010
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 12573-2008 — Sampling method for cement
GB/T 12960-2019 — Quantitative determination of constituents of cement
GB/T 1346-2024 — Test methods for water requirement of standard consistency, setting time and soundness of the Portland cement
Secure payment via Stripe
Payments accepted
GB 25029-2010
$125.00