Scope
GB 13750-2004 is the English-translated version of 振动沉拔桩机 安全操作规程.
GB 13750-2004 — This document specifies the safe operation requirements for vibratory pile sinking and pulling machines and operators before, during and after operation.
This document applies to vibratory sinking and pulling out equipment consisting of a vibrating pile hammer (hereinafter referred to as "vibrating hammer") and a pile frame, crane (including crane ship), excavator, etc. The safe use and operation of pile drivers (hereinafter referred to as "pile drivers").
Found what you need?
Document preview — GB 13750-2004
National Standard of the People's Republic of China
- ICS
- 91.220
- Classification
- P 97
- Replacing
- GB/T 13750-2004
Issued by: State Administration for Market Regulation, China National Standardization Administration
Contents
- 1 Scope
- 2 Normative reference documents
- 3 Terms and Definitions
- 4 General provisions
- 4.1 General requirements
- 4.2 Pile driver 2 combined with vibrating hammer and pile frame or crane (including crane ship)
- 4.3 Pile driver combined with vibrating hammer and excavator
- 5 Operating conditions
- 5.1 General requirements
- 5.2 Pile driver 3 combined with vibrating hammer and pile frame or crane (including crane ship)
- 5.3 Pile driver combined with vibrating hammer and excavator
- 6 Pre-work inspection
- 6.1 General requirements
- 6.2 Pile driver 3 combined with vibrating hammer and pile frame or crane (including crane ship)
- 6.3 Pile driver combined with vibrating hammer and excavator
- 7 Requirements for safe operation during operation
- 7.1 General requirements
- 7.2 Pile driver combined with vibrating hammer and pile frame or crane (including crane ship)
- 7.3 Pile driver combined with vibrating hammer and excavator
- 8 Things to note after work
- Appendix A (normative) Selection, installation and use of wire rope clamps
- A.1 General provisions
- A.2 Installation
- A.3 Number of rope clamps
- A.4 Tightening torque
Foreword
This document complies with the provisions of GB/T 1.1-2020 "Standardization Work Guidelines Part 1: Structure and Drafting Rules of Standardization Documents" Drafting.
This document replaces GB/T 13750-2004 "Safe Operating Procedures for Vibratory Pile Sinking and Extraction Machines". Compared with GB/T 13750-2004, except in addition to structural adjustments and editorial changes, the main technical changes are as follows.
a) The scope of application of this document has been changed (see Chapter 1, Chapter 1 of the 2004 edition);
b) Added a "Terms and Definitions" chapter (see Chapter 3);
c) General safety requirements are added (see 4.1.2, 4.1.3, 4.1.5, 4.1.9~4.1.12);
d) The loading, unloading and maintenance requirements for pile drivers and components have been changed (see 4.1.7, 3.2 and 3.4 of the 2004 edition);
e) Changed the requirements for the safe distance of the vibrating hammer from the top of the pile frame (see 4.1.8, 6.6 of the 2004 edition);
f) The regulations for inspection and maintenance of wire ropes have been changed (see 4.1.13, 5.1 of the 2004 edition);
g) Added specifications for the transportation, loading, unloading and maintenance of pile frames, cranes and winches (see 4.2.1~4.2.3);
h) Added safety factor requirements for pile driver wire ropes (see 4.2.4);
i) Added requirements for hand flag signals for water construction (see 4.2.5);
j) Added general operating requirements for the pile driver combined with a vibrating hammer and excavator (see 4.3);
k) The requirements for track-type pile drivers are deleted (see 4.3 and 7.2 of the 2004 edition);
l) Changed the requirements for the distance between pile drivers and overhead transmission lines (see 5.1.2, 4.4 of the 2004 edition);
m) Added requirements for fire extinguishing equipment at the work site (see 5.1.4);
n) Added lighting requirements for night operations (see 5.1.5);
o) The requirements for grounding specific pressure and working site slope have been changed (see 5.2.1, 4.1 and 4.2 of the 2004 edition);
p) The requirements for the external power supply and wiring of the pile driver have been changed (see 5.2.2, 5.2.3, 4.5 of the 2004 edition);
q) Added requirements for crane selection (see 5.2.4);
r) Added layout requirements for diesel engine ventilation and exhaust systems (see 5.2.5);
s) Added operating condition requirements for water construction (see 5.2.6);
t) Added operating condition requirements for pile drivers combining vibrating hammers and excavators (see 5.3);
u) The inspection requirements for bolts in various parts of the pile driver before operation have been changed (see 6.1.1, 5.9 and 5.11 of the 2004 edition);
v) Added inspection requirements for the hydraulic system before operation (see 6.1.2~6.1.5);
w) Changed the inspection requirements for tooth surface wear of hydraulic clamps before operation (see 6.1.8, 5.15 of the 2004 edition);
x) The requirements for checking the insulation resistance of the electrical system before operation have been changed (see 6.2.2, 5.6 and 5.7 of the 2004 edition);
y) Added inspection requirements for the diesel engine air inlet and outlet system before operation (see 6.2.5);
z) Added inspection requirements for pile drivers combined with vibrating hammers and excavators before operation (see 6.3);
aa) The operation mode of left and right diagonal braces has been deleted (see 6.3 of the 2004 edition);
bb) Delete the description of the relationship between pile sinking speed and excessive current (see 6.10 of the 2004 edition);
cc) Added safety operation requirements for driver operating locations and personnel (see 7.1.1~7.1.3);
dd) Changed the safety requirements for pile driver maintenance during operation (see 7.1.7, 6.15 of the 2004 edition);
ee) Added operating requirements for starting and stopping the resonance-free vibrating hammer (see 7.1.8);
ff) Added operational requirements for automatic pressure compensation during hydraulic fixture operation (see 7.1.10);
gg) Added operational requirements for pile pulling operations (see 7.1.11, 7.1.12);
hh) Added inspection of diesel engine pre-ignition (see 7.1.13);
i) The operating requirements for pile driver rotation have been changed (see 7.2.2, 6.4 of the 2004 edition);
j) The restriction requirements for the synchronous action of the pile driver have been changed (see 7.2.3, 6.1 of the 2004 edition);
kk) Added requirements for safe operation when the pile driver is traveling (see 7.2.4);
l) The operational requirements for static pile pulling have been changed (see 7.2.6, 6.8 of the 2004 edition);
mm) Added requirements for driving inclined piles (see 7.2.7 and 7.2.8);
nn) Added operational requirements for water construction operations (see 7.2.10~7.2.12);
oo) Added operational requirements for pile driving operations using a combination of vibrating hammer and excavator (see 7.3);
pp) The requirements for stopping and placing the pile driver after operation have been changed (see 8.1, 7.1 of the 2004 edition);
qq) Added requirements for transportation and storage of the power station after operation (see 8.2);
rr) Added maintenance requirements for the pile driver combined with vibrating hammer and excavator after operation (see 8.5);
ss) Added requirements for equipment placement after water construction operations (see 8.6);
tt) The requirements for the use of rope clamps have been changed (see Appendix A, 3.6 of the 2004 edition).
Please note that some content in this document may be subject to patents. The publisher of this document assumes no responsibility for identifying patents.
1 Scope
This document specifies the safe operation requirements for vibratory pile sinking and pulling machines and operators before, during and after operation.
This document applies to vibratory sinking and pulling out equipment consisting of a vibrating pile hammer (hereinafter referred to as "vibrating hammer") and a pile frame, crane (including crane ship), excavator, etc.
The safe use and operation of pile drivers (hereinafter referred to as "pile drivers").
2 Normative reference documents
The contents of the following documents constitute essential provisions of this document through normative references in the text. Among them, the dated quotations for undated referenced documents, only the version corresponding to that date applies to this document; for undated referenced documents, the latest version (including all amendments) applies to this document.
GB/T 5972 Crane wire rope care, maintenance, inspection and scrapping GB/T 5976 Wire rope clamp GB/T 6067.1 Safety regulations for lifting machinery Part 1: General principles GB/T 7920.6 Building construction machinery and equipment Piling equipment terminology and commercial specifications GB 22361-2008 Safety Specifications for Piling Equipment JB/T 8521.1 Safety of braided slings Part 1: General purpose synthetic fiber flat slings JB/T 10599 Vibrating pile hammer for construction machinery and equipment JB/T 12315 Building construction machinery and equipment pile frames
3 Terms and definitions
The terms and definitions defined in GB/T 7920.6 and JB/T 10599 apply to this document.
4 General provisions
4.1 General requirements
4.1.1 Operators should receive special training and be familiar with the performance, structure, use and maintenance methods of the pile driver they operate.
can be operated later.
4.1.2 Operators should not operate the pile driver after consuming alcoholic beverages.
4.1.3 Operators should wear personal safety protective equipment as required, have clear division of labor and unified command.
4.1.4 When working at height (fall height 2m or more), the operator should wear a safety belt.
4.1.5 The work site should be kept clean and tidy, and tools should be placed according to categories; potential safety hazards at the work site should be eliminated in a timely manner.
4.1.6 Electrical equipment should be installed, maintained and inspected by certified electricians.
4.1.7 The pile driver and each configured component should be transported, assembled, tested, disassembled and maintained in accordance with the instruction manual.
4.1.8 The pile driver should be equipped with a limit switch to ensure a safe distance between the top of the vibrating hammer and the bottom of the pulley block at the top of the pile driver. The safe distance is vibration the distance between the movable hammer rising to the top of the pile driver and before collision should not be less than 1m.
4.1.9 The pile pulling force should not be greater than the pile driver's calibrated maximum pile pulling force.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 6 pages — is available in the English PDF.
How to Download GB 13750-2004
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB 11118-2026 — Hydraulic fluids (L-HL, L-HM, L-HV, L-HS and L-HG type)
GB 11557-2026 — Provisions for protecting drivers from injury by the steering mechanism of motor vehicles
GB 12021.4-2026 — Maximum allowable values of the energy consumption, water consumption and grades for electric washing machines and washer-dryers
Secure payment via Stripe
Payments accepted
GB 13750-2004
$95.00