GA/T 969-2011Technical requirements for the training facility of fire screen (English PDF)

火幕墙训练设施技术要求

Preview PDF

GA/T 969 | Evolution and historical versions

Std IDTitleStatus
XF/T 969-2011Technical requirements for the training facility of fire screenValid
GA/T 969-2011Technical requirements for the training facility of fire screenObsolete

GA/T 969-2011 is obsolete. It has been replaced by XF/T 969-2011. This page sells the obsolete edition, for projects and contracts that still cite it.

This is a limited preview

Buy now to download the full PDF

Need quotation for your management?

Get a formal quotation for GA/T 969-2011 in 30 minutes.

Issued by

MOPS

Level / Type

National · Recommended

Issue date

December 9, 2011

Implementation date

March 1, 2012

Scope

GA/T 969-2011 is the English-translated version of 火幕墙训练设施技术要求.

GA/T 969-2011 is the Chinese industry standard "Technical requirements for the training facility of fire screen". It was issued on December 9, 2011 by MOPS, and took effect on March 1, 2012. It is obsolete: it has been replaced by XF/T 969-2011.

Found what you need?

Document preview — GA/T 969-2011

National Standard of the People's Republic of China

Issued by: MOPS

Contents

  • Document data
1 Document data

Sector: National Recommended (industry standard).

Issuing body: MOPS.

Date of issue: 2011-12-09.

Date of implementation: 2012-03-01.

Status: obsolete, replaced by XF/T 969-2011.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.

How to Download GA/T 969-2011

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GA/T 969-2011

$195.00