GA/T 70-1994Compiling methods of expense budget for security engineering construction and maintaining service (English PDF)
This is a limited preview
Buy now to download the full PDF (30 pages)
Need quotation for your management?
Get a formal quotation for GA/T 70-1994 in 30 minutes.
Issued by
Ministry of Public Security
Level / Type
National · Recommended
Issue date
August 5, 2014
Implementation date
October 1, 2014
Scope
GA/T 70-1994 (Compiling methods of expense budget for security engineering construction and maintaining service) is available as an English-translated PDF.
GA/T 70-1994 — This standard specifies the security and maintenance of the Project Cost structure and calculation method of maintenance costs, is the preparation of security engineering construction Set up and maintenance cost estimates, budgets and accounts basis.
This standard applies to new construction, expansion and renovation project of the building of security and maintenance services.
Found what you need?
Document preview — GA/T 70-1994
National Standard of the People's Republic of China
- ICS
- 13.310
- Classification
- A 91
- Replacing
- GA/T 70-2004
Issued by: Ministry of Public Security
Contents
- Preface
- 1 Scope
- 2 Normative references
- 3 Terms and definitions
- 4 Security Project construction costs
- 4.1 Construction cost composition
- 4.2 Project cost
- Construction of other costs 4.3
- 4.4 9 contingencies
- 9 4.5 Special charges
- 5 Maintenance Fee
- 5.1 Cost composition
- 5.2 Maintenance survey and design fees
- 5.3 Maintenance service charges
Foreword
This standard was drafted in accordance with GB/T 1.1-2009 given rules.
This standard is GA/T 70-2004 "Security Project cost budgeting" amendment, and the standard name changed to "security Full guard Construction and maintenance costs budgeting. " this standard compared with GA/T 70-2004, the main technical changes are as follows.
--- Expanding the scope of the standard;
--- Update relevant references;
--- Required standard content increases, amended some of the terms and definitions (3.1,3.2,3.9,3.18,3.20 ~ 3.23,3.25,3.26,
2004 Version 3.2, 3.3 ~ ~ 3.5,3.7,3.10 3.12,3.14,3.15);
--- Increasing the calculation of the Bill of Quantities (4.2.3);
--- The construction unit management fee calculation has been revised (4.3.2);
--- To calculate the tender agent fees were revised (4.3.4);
--- Costs of engineering investigation, engineering design fee calculation has been revised (4.3.5,4.3.6);
--- Construction supervision fee calculation has been revised (4.3.7);
--- Increase the feasibility study costs, maintenance costs of maintenance calculation (4.3.5, Chapter 5).
This standard by the National Security Alarm System Standardization Technical Committee (SAC/TC100) and focal points.
This standard was drafted. First Research Institute of Ministry of Public Security, Beijing Univision Aegis Security Technology Co., Ltd., Beijing Sound Xun Electronics Company Limited Division, Beijing Fusheng Electronic Co., Ltd.
1 Scope
This standard specifies the security and maintenance of the Project Cost structure and calculation method of maintenance costs, is the preparation of security engineering construction Set up and maintenance cost estimates, budgets and accounts basis.
This standard applies to new construction, expansion and renovation project of the building of security and maintenance services.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document.
GB 50500-2013 construction engineering bill pricing norms
3 Terms and Definitions
The following terms and definitions apply to this document.
Fixed ration
Provisions in the amount of security engineering and construction unit of the product of labor, materials, machinery, capital consumption.
Budget quota budgetration Security to the various sub-projects (ie in the project can be divided entity apart) was measured, the provisions consumed in the unit project Artificial (man-days), materials, mechanical (equipment) sets the number of standard class.
Labor costs laborexpense Constitute gross wage provisions in the fees paid to the construction and installation works of production workers and production units affiliated workers.
Materials and engineering equipment costs materialexpense Consuming construction process cost raw materials, auxiliary materials, components and parts, components, semi-finished or finished products, engineering equipment.
Construction equipment fee constructionequipmentexpense Construction machinery, instruments royalties construction work occurred or rental fee.
Enterprise management fees enterpriseadministrationexpense Construction and installation of construction enterprises needed to organize production and management costs.
Fees fees
According to the national laws and regulations, by the relevant provincial governments and provincial authorities must pay or provisions to take into account the cost.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 30 pages — is available in the English PDF.
Referenced standards
Normative references
GB 50500-2013
How to Download GA/T 70-1994
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GA/T 2322-2025 — Forensic sciences-Code of practice for latent fingerprint development by superglue of humidity and heat
GA/T 2323-2025 — Forensic sciences-Examination methods for thiosulfate ions in biologicasamples - LC-MS
GA/T 2324-2025 — Forensic sciences-Examination methods for 13 shellfish toxins including saxitoxin in biological samples - LC-MS
Secure payment via Stripe
Payments accepted
GA/T 70-1994
$1,034.00