GA/T 2092.4-2023Mobile acquisition and entry terminal based on cross-network application for crime scene investigation - Part 4: Data upload interface (English PDF)
基于跨网应用的现场勘验移动采集录入终端 第4部分:数据上传接口
This is a limited preview
Buy now to download the full PDF (14 pages)
Need quotation for your management?
Get a formal quotation for GA/T 2092.4-2023 in 30 minutes.
Issued by
Ministry of Public Security
Level / Type
National · Recommended
Issue date
March 1, 2023
Implementation date
December 1, 2023
Scope
GA/T 2092.4-2023 is the English-translated version of 基于跨网应用的现场勘验移动采集录入终端 第4部分:数据上传接口.
GA/T 2092.4-2023 — This document specifies the data interface specifications between on-site survey mobile collection entry terminals and on-site survey systems based on cross-network applications.
This document is applicable to the interface for data mobile collection, entry, storage, processing, exchange and sharing of on-site inspection information.
Found what you need?
Document preview — GA/T 2092.4-2023
National Standard of the People's Republic of China
- ICS
- 13.310
- Classification
- A 92
Issued by: Ministry of Public Security
Contents
- Foreword
- Introduction
- 1 Scope
- 2 Normative reference documents
- 3 Terms and definitions
- 4 Interface requirements
- 4.1 System access interface
- 4.2 Apply for token interface
Foreword
This document complies with the provisions of GB/T 1.1-2020 "Standardization Work Guidelines Part 1: Structure and Drafting Rules of Standardization Documents" Drafting.
This document is Part 4 of GA/T 2092 "Mobile collection and entry terminal for on-site inspection based on cross-network application". GA/T 2092 has been the following sections have been published.
---Part 1: Basic functions;
---Part 2: Basic data items;
---Part 3: Equipment requirements;
---Part 4: Data upload interface.
Please note that some content in this document may be subject to patents. The publisher of this document assumes no responsibility for identifying patents.
Introduction
In the context of the current intelligent, mobile and efficient police office, using mobile equipment, mobile APP and powerful backend informatization it is imperative that the platform supports rapid on-site survey. In order to solve the problem of insufficient support for new information methods in traditional exploration and incompatibility with dynamic actual combat needs, in response to the problems, there is an urgent need to sort out the on-site investigation workflow and information flow, and formulate relevant standards, which will help standardize the mobile on-site investigation business work.
work, and provide normative reference for the construction of related informatization projects.
After extensive research, in-depth demonstration, and continuous improvement, technical standards and specifications for mobile collection and entry of on-site inspections have been formed. According to the criminal investigation information Information resource planning requirements, focusing on the information application needs of criminal technology on-site investigation, the "On-site inspection migration based on cross-network application" was formulated.
"Mobile Collection and Input Terminal" standard as the basis for the construction of national mobile investigation systems and equipment projects; at the same time, in accordance with the inherent characteristics of criminal technical work Business logic to build an information group for mobile collection, transmission synchronization, classification management, safe storage, integrated application, and full sharing of on-site survey information the organizational structure provides practical applications for extensively obtaining case scene information, carrying out technical research and judgment with the support of information technology, and obtaining investigation clues.
Assure.
As a new round of scientific and technological revolution and industrial transformation continue to advance, the forms of crime are undergoing profound changes, resulting in on-site investigation work facing a transformation.
Type upgrade. In the context of the new era, on-site investigation work is required to develop in an intelligent and practical direction. Through the use of mobile equipment or mobile the APP provides investigators with functions such as information collection, query, comparison and online business processing, and enhances the police's on-site handling capabilities. GA/T 2092 "Mobile Collection and Input Terminal for On-site Inspection Based on Cross-Network Application" is planned to consist of four parts.
---Part 1: Basic functions. The purpose is to clarify the basic requirements for business applications of mobile collection and entry terminals for various types of on-site inspections.
basic functions.
---Part 2: Basic data items. The purpose is to clarify the data storage requirements of various types of on-site inspection mobile collection and entry terminals.
Data specifications.
---Part 3: Equipment requirements. The purpose is to clarify the characteristics that the operating environment of various types of on-site inspection mobile collection and entry terminals needs to meet.
Can request.
---Part 4: Data upload interface. The purpose is to clarify the data reporting requirements for various types of on-site inspection mobile collection and entry terminals.
Interaction process and interface specifications.
Based on cross-network applications on-site inspection mobile collection and entry terminal Part 4: Data upload interface
1 Scope
This document specifies the data interface specifications between on-site survey mobile collection entry terminals and on-site survey systems based on cross-network applications.
This document is applicable to the interface for data mobile collection, entry, storage, processing, exchange and sharing of on-site inspection information.
2 Normative reference documents
This document has no normative references.
3 Terms and definitions
There are no terms or definitions to be defined in this document.
4 Interface requirements
4.1 System access interface
All interfaces between the backend of the on-site survey mobile collection and entry terminal and the on-site survey system are accessed using restful methods; the interface method parameters both the data and the returned results use json format for interaction; when making system requests, the https request headers are uniformly encapsulated (should comply with the requirements of Appendix A Regulation).
The public information of https request headers is explained as follows.
"imei"."Device imei", "version"."Client system version", "mac"."mac address", "token"."token", "Pn"."Request PN", "miyao"."key"
4.2 Apply for token interface
The registered on-site survey mobile collection entry terminal calls this interface to obtain the on-site survey certification token.
Before each call to other interfaces, the mobile collection and entry terminal should first call this interface to obtain the token, and the obtained token will be used as the tool for calling other interfaces.
Required parameters for other interfaces. Only after obtaining the token, the mobile collection and entry terminal can call other interfaces.
See Table 1 for the token application interface requirements.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 14 pages — is available in the English PDF.
How to Download GA/T 2092.4-2023
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GA/T 2092.1-2023 — Mobile acquisition and entry terminal based on cross-network application for crime scene investigation - Part 1: Basic functions
GA/T 2092.2-2023 — Mobile acquisition and entry terminal based on cross-network application for crime scene investigation - Part 2: Elementary data items
GA/T 2092.3-2023 — Mobile acquisition and entry terminal based on cross-network application for crime scene investigation - Part 3: Requirements for equipment
Secure payment via Stripe
Payments accepted
GA/T 2092.4-2023
$300.00