Issued by
Ministry of Public Security
Level / Type
National · Mandatory
Issue date
February 28, 2023
Implementation date
July 1, 2023
Scope
GA 1814.1-2023 is the English-translated version of 铁路系统反恐怖防范要求 第1部分:客运车站.
GA 1814.1-2023 — This document stipulates the key targets and key parts of anti-terrorism prevention at passenger transport stations, key target levels and prevention levels, and overall prevention requirements: requirements, normal third-level prevention requirements, normal second-level prevention requirements, normal first-level prevention requirements, abnormal prevention requirements and security prevention system technology Require: This document applies to the anti-terrorism prevention work and management of passenger stations:
Found what you need?
Document preview — GA 1814.1-2023
National Standard of the People's Republic of China
- ICS
- 13.310
- Classification
- A 91
Issued by: Ministry of Public Security
Contents
- Introduction
- 1 Scope
- 2 Normative references
- 3 Terms and Definitions
- 4 Key objectives and key parts
- 5 Key target levels and prevention levels
- 6 Overall prevention requirements
- 7 Normal three-level prevention requirements
- 8 Normal secondary prevention requirements
- 9 Normal level one prevention requirements
- 10 Abnormal prevention requirements
- 11 Technical requirements for security systems
- Appendix A (normative) Configuration of normal prevention facilities at passenger stations
- Reference
Foreword
This document complies with the provisions of GB/T 1.1-2020 "Standardization Work Guidelines Part 1: Structure and Drafting Rules of Standardization Documents" Drafting:
This document is Part 1 of GA 1814-2023 "Anti-Terrorism Prevention Requirements for Railway Systems": GA 1814-2023 has been released with Lower part:
---Part 1: Passenger transport station;
---Part 2: Passenger trains;
---Part 3: Operation lines;
---Part 4: Key places;
---Part 5: Transport of dangerous goods:
This document is sponsored by the Office of the National Anti-Terrorism Leading Group, China State Railway Group Co:, Ltd:, Counter-Terrorism Bureau of the Ministry of Public Security, and the Ministry of Public Security:
Proposed by the Railway Public Security Bureau and the Science and Technology Information Bureau of the Ministry of Public Security:
This document is under the jurisdiction of the National Security Alarm System Standardization Technical Committee (SAC/TC100):
Introduction
Railway is the main artery of the national economy and an important infrastructure of the country: It plays an important role in the sustained, rapid and high-quality development of the national economy:
the supporting role: In order to establish a long-term mechanism for anti-terrorism prevention in the railway system and improve the ability and level of anti-terrorism prevention in the railway system, according to the "China the Anti-Terrorism Law of the People's Republic of China and other relevant laws, regulations and normative documents, and GA 1814-2023 "Anti-Terrorism Prevention and Control for Railway Systems" was formulated:
Standard Requirements" series of standards: GA 1814-2023 implements anti-terrorism prevention regulations for key target management units in preventing terrorist attacks in the railway system:
This provides a basis for relevant departments to supervise and inspect the implementation of anti-terrorism prevention responsibilities by key target management units:
According to the specific structure and scene of the railway, the key targets and key parts of preventing terrorist attacks, and the needs of the current anti-terrorist situation According to requirements, GA 1814-2023 "Anti-Terrorism Prevention Requirements for Railway Systems" is divided into 5 parts: passenger stations, passenger trains, operating lines, and key sites:
, transportation of dangerous goods:
---Part 1: Passenger station: The purpose is to provide a basis for the implementation of anti-terrorism prevention responsibilities at passenger stations in the railway system:
---Part 2: Passenger trains: The purpose is to provide a basis for the implementation of anti-terrorism prevention responsibilities for passenger trains in the railway system:
---Part 3: Operational lines: The purpose is to provide a basis for the implementation of anti-terrorism prevention responsibilities for railway system operating lines:
---Part 4: Key places: The purpose is to provide a basis for the implementation of anti-terrorism prevention responsibilities in key places on the railway system:
---Part 5: Transport of dangerous goods: The purpose is to provide information for the implementation of anti-terrorism prevention responsibilities for the transportation of dangerous goods in the railway system:
in accordance with:
Anti-terrorism prevention requirements for railway systems Part 1: Passenger Station
1 Scope
This document stipulates the key targets and key parts of anti-terrorism prevention at passenger transport stations, key target levels and prevention levels, and overall prevention requirements:
requirements, normal third-level prevention requirements, normal second-level prevention requirements, normal first-level prevention requirements, abnormal prevention requirements and security prevention system technology Require:
This document applies to the anti-terrorism prevention work and management of passenger stations:
2 Normative reference documents
The contents of the following documents constitute essential provisions of this document through normative references in the text: Among them, the dated quotations for undated referenced documents, only the version corresponding to that date applies to this document; for undated referenced documents, the latest version (including all amendments) applies to this document:
GB 2894 Safety signs and guidelines for their use GB 12899 General technical specifications for handheld metal detectors GB 15208.1 Microdose X-ray safety inspection equipment Part 1: General technical requirements GB 15208.2-2018 Micro-dose X-ray safety inspection equipment Part 2: Transmission luggage safety inspection equipment GB 15210 General technical specifications for pass-through metal detection doors GB 17565-2022 General technical conditions for anti-theft security doors GB/T 28181 Technical requirements for information transmission, exchange and control of public security video surveillance network systems GB/T 32581 Technical requirements for intrusion and emergency alarm systems GB 35114 Public security video surveillance network information security technical requirements GB/T 37078-2018 Technical requirements for entrance and exit control systems GB 50348-2018 Safety prevention engineering technical standards GB 55029 General specifications for safety prevention engineering GA 69 explosion-proof blanket GA 844 anti-smash transparent material
3 Terms and definitions
The following terms and definitions as defined in GB 50348-2018 apply to this document:
Passenger station Handle railway passenger transport business and provide a place with boarding and alighting functions for railway passengers:
[Source: TB10100-2018, 2:0:1, with modifications] 3.2 A platform that extends a certain width from the station building's outer wall toward the city and connects various parts of the station building and the entrances and exits:
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 11 pages — is available in the English PDF.
How to Download GA 1814.1-2023
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GA 1814.2-2023 — Requirements for counter-terrorism of railway system - Part 2: Passenger train
GA 1814.3-2023 — Requirements for counter-terrorism of railway system - Part 3: Lines in operation
GA 1814.4-2023 — Requirements for counter-terrorism of railway system - Part 4: Key places
Secure payment via Stripe
Payments accepted
GA 1814.1-2023
$210.00