Valid

FZ/T 94020-2009Silk shuttle loom (English PDF)

Preview PDF

This is a limited preview

Buy now to download the full PDF (4 pages)

Need quotation for your management?

Get a formal quotation for FZ/T 94020-2009 in 30 minutes.

Issued by

Ministry of Industry and Information Technology of the People's Republic of China

Level / Type

National · Recommended

Issue date

January 20, 2010

Implementation date

June 1, 2010

Scope

FZ/T 94020-2009 (Silk shuttle loom) is available as an English-translated PDF.

FZ/T 94020-2009 — This standard specifies the shuttle silk machine characteristics and the main parameters, technical requirements, test methods, inspection rules and signs, packaging, transportation Transport, storage and other requirements.

This standard applies to weave silk, rayon, silk fabrics synthetic silk loom shuttle.

Found what you need?

Document preview — FZ/T 94020-2009

National Standard of the People's Republic of China

ICS
59.120.30
Classification
W 94
Replacing
FZ/T 94020-1995

Issued by: Ministry of Industry and Information Technology of the People's Republic of China

Contents

  • Foreword
  • 1 Scope
  • 2 Normative references
  • 3 Main parameters and characteristics of the machines
  • 3.1 Machine characteristics

Foreword

Instead of the standard FZ/T 94020 "shuttle silk machine." Compared with the standard FZ/T 94020-1995 The main changes are as follows.

--- Increase in Chapter 1, "scope";

--- Increased Chapter 2, "Normative references";

--- An increase of 4.10 "Electrical Safety";

--- An increase of 6.2 "type test";

--- Original standard Chapter 1, "and the main parameters of different specifications," postponed to Chapter 3, the words "the main parameters and specifications";

--- Original standard Chapter 2, "technical requirements" postponed to Chapter 4, the words "requirements" and made some editorial adjustments;

--- Original standard Chapter 3, "test" postponed to Chapter 5, according to the provisions of GB 1.1 made major changes;

--- Original standard Chapter 4, "Inspection Rules" postponed to Chapter 6, according to the provisions of GB 1.1 adds 6.2 "type test";

--- Original standard Chapter 5 "logo, painting, packaging, transportation and storage" be postponed to Chapter 7, the words "signs, packaging, transportation, storage," and Made some editorial changes to adjust;

--- Remove the original standard 2.2.1.1 "rack-mounted basic requirements";

--- Remove the original standard 2.2.2.6 "weft stop requirements";

--- Original standard 2.2.2.4 split in two, that this edition 4.3.4 and 4.3.5, respectively, photoelectric weft and weft stop proposed Claim;

--- Original standard 2.2.1.3 and 2.2.1.4 of "camshaft" to "central axis" (see 4.2.2 and 4.2.3);

--- The "Walk with reed shuttle surface plane, the angle between the back and the bottom of the shuttle tank to 89 °", to "take the shuttle plane reed plane, shuttle back and bottom of the box clip Angle of 88 ° ~ 89 ° "(1995 edition of 2.2.2.1; this version 4.3.1);

Chapter 3 --- original standard test method 3.1.3.2 Move to Chapter 4 requirements, to 4.2.9;

Chapter 3 --- original standard test method 3.1.3.3 Move to Chapter 4 requirements, to 4.2.6;

Chapter 3 --- original standard test method 3.1.3.7 Move to Chapter 4 requirements, to 4.6;

Chapter 3 --- original standard test method 3.1.3.8 Move to Chapter 4 requirements, to 4.7;

--- Original standard Chapter 5 "logo, painting, packaging, transport and storage" in the move to 5.2 Chapter 4 requirements, to 4.8;

--- Other editorial changes.

The standard proposed by China Textile Industry Association.

This standard by the National Standardization Technical Committee Textile machinery and accessories.

This standard was drafted. Textile Machinery Co., Ltd. in Hangzhou, Zhejiang Founder Textile Machinery Testing Center Co., Ltd., Zhejiang University of Technology.

1 Scope

This standard specifies the shuttle silk machine characteristics and the main parameters, technical requirements, test methods, inspection rules and signs, packaging, transportation Transport, storage and other requirements.

This standard applies to weave silk, rayon, silk fabrics synthetic silk loom shuttle.

2 Normative references

The following documents contain provisions which, through reference in this standard and become the standard terms. For dated references, subsequent Amendments (not including errata content) or revisions do not apply to this standard, however, encourage the parties to the agreement are based on research Whether the latest versions of these documents. For undated reference documents, the latest versions apply to this standard.

GB/T 7111.1 Textile machinery - Noise test code - Part 1. General requirements GB/T 7111.6-2002 Textile machinery - Noise test code - Part 6. Weaving Machinery FZ/T 90001 Textile machinery Packaging FZ/T 90074 textile machinery products Painting FZ/T 90089.1 textile machinery nameplate types, sizes and technical requirements FZ/T 90089.2 textile machinery nameplate content FZ/T 93010 change shuttle plastic pirn FZ/T 94002 Wooden exchange shuttle FZ/T 94011 series tie with a wire loom reed

3 Main parameters and characteristics of the machines

3.1 Machine characteristics

--- Frame structure. separate front and rear of the rack;

--- Type. left style, right style;

--- Shuttle changing ways. automatically or manually;

--- Operation. Lever operation or electrical button.

3.2 The main parameters 3.2.1 reed width series main specifications. 110cm, 145cm, 160cm.

3.2.2 shuttle box series. 1 × 1,1 × 2,2 × 2,4 × 4.

Table 1 3.2.3 crankshaft speed.

Table 1

Reed width/cm

Shuttle-box configuration 1 × 1 1 × 2 2 × 2 4 × 4 Speed / (r/min) 110 170 to 215 150 to 205 117 to 147 117 to 130 145 150 to 195 130 to 185 114 to 140 114 to 130 160 140 to 185 120 to 175 108 to 134 108 to 123

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 4 pages — is available in the English PDF.

Referenced standards

How to Download FZ/T 94020-2009

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
4 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

FZ/T 94020-2009

$134.00