Valid

EJ/T 349.4-1998Determination of trace uranium and thorium in rocks - Spectrophotometric method after successive separation by P350-adsorbed resin extraction chromatography (English PDF)

岩石中微量铀钍的测定P350-吸附树脂萃取色层连续分离分光光度法

Preview PDF

This is a limited preview

Buy now to download the full PDF

Need quotation for your management?

Get a formal quotation for EJ/T 349.4-1998 in 30 minutes.

Issued by

China National Nuclear Corporation

Level / Type

National · Recommended

Issue date

March 25, 1998

Implementation date

September 1, 1998

Scope

EJ/T 349.4-1998 is the English-translated version of 岩石中微量铀钍的测定P350-吸附树脂萃取色层连续分离分光光度法.

EJ/T 349.4-1998 is the Chinese industry standard "Determination of trace uranium and thorium in rocks - Spectrophotometric method after successive separation by P350-adsorbed resin extraction chromatography".

It was issued on March 25, 1998 by the China National Nuclear Corporation, and took effect on September 1, 1998. It is in force.

Found what you need?

Document preview — EJ/T 349.4-1998

National Standard of the People's Republic of China

Issued by: China National Nuclear Corporation

Contents

  • Document data
1 Document data

Sector: Nuclear (industry standard).

Issuing body: China National Nuclear Corporation.

Date of issue: 1998-03-25.

Date of implementation: 1998-09-01.

Status: valid.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.

How to Download EJ/T 349.4-1998

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

EJ/T 349.4-1998

$180.00