DZ/T 0266-2014Regulation on remote sensing monitoring of mining exploration (English PDF)
矿产资源开发遥感监测技术规范 清晰版
This is a limited preview
Buy now to download the full PDF (31 pages)
Need quotation for your management?
Get a formal quotation for DZ/T 0266-2014 in 30 minutes.
Issued by
Ministry of Land and Resources
Level / Type
National · Recommended
Issue date
October 16, 2014
Implementation date
December 30, 2014
Scope
DZ/T 0266-2014 is the English-translated version of 矿产资源开发遥感监测技术规范 清晰版.
DZ/T 0266-2014 — This standard specifies the remote sensing monitoring of mineral resources development (mineral resources development status, mine geological environment problems and mineral resources planning, etc.)
Work content, procedures, methods and requirements. This standard is applicable to the application of aviation and aerospace remote sensing technology for remote sensing monitoring of mineral resources development.
Mineral resources development emergency monitoring and other workers can be referred to the implementation.
Found what you need?
Document preview — DZ/T 0266-2014
National Standard of the People's Republic of China
- ICS
- 73.020
- Classification
- D 10
Issued by: Ministry of Land and Resources
Contents
- Foreword
- Introduction
- 1 Scope
- 2 Normative references
- 3 Terms and definitions
- 4 General
- 4.1 Purpose task
- 4.2 Work content
Foreword
This standard was drafted in accordance with the rules given in GB/T 1.1-2009.
This standard was proposed by the Ministry of Land and Resources of the People's Republic of China.
This standard is under the jurisdiction of the National Land Resources Standardization Technical Committee (SAC/TC93).
This standard was drafted. China Land Resources Aviation Geophysical and Remote Sensing Center.
Introduction
Based on the summary of multi-objective remote sensing survey and monitoring methods for mineral resources development, remote sensing monitoring for the development of mineral resources this standard is formulated in terms of content, procedures, methods, and requirements.
Technical specification for remote sensing monitoring of mineral resources development
1 Scope
This standard specifies the remote sensing monitoring of mineral resources development (mineral resources development status, mine geological environment problems and mineral resources planning, etc.) Work content, procedures, methods and requirements.
This standard is applicable to the application of aviation and aerospace remote sensing technology for remote sensing monitoring of mineral resources development. Mineral resources development emergency monitoring and other workers can be referred to the implementation.
2 Normative references
The following documents are indispensable for the application of this document. For dated references, only the dated version applies to this article.
Pieces. For undated references, the latest edition (including all amendments) applies to this document.
GB/T 17695 Map public symbol for public information graphic symbols DZ/T 0191 1.250000 geological map geographic base map coding specification GB 14512 1.1000000 topographic map compilation specification and schema
3 Terms and definitions
The following terms and definitions apply to this document.
Remote sensing monitoring Use of one or more remote sensing data, combined with mineral resource planning, prospecting rights, mining rights data, mineral resources development status, mines Remote sensing investigations such as mountain geological environment problems and mineral resources planning (implementation).
Mine geological environment problem mininggeo-environmentalproblems Refers to the destruction of the geological environment caused by activities such as exploration and exploitation of mineral resources. Mainly including mining ground subsidence, ground fissure, and collapse Geological disasters such as collapse and landslide; aquifer destruction; topographic and landscape damage, water and soil pollution.
Tailings resources tailingresourses Under certain economic and technical conditions, tailings formed with a certain scale and (future) can be developed and utilized.
4 General
4.1 Purpose task
Through remote sensing monitoring such as the development and utilization of mineral resources, mine geological environmental issues and mineral resources planning (implementation), Obtain objective basic data, form a comprehensive analysis and evaluation report, develop mineral resource planning for the country, and maintain the sustainable development of mineral resources Provide technical support and decision-making basis for utilizing and maintaining mining order, managing mineral geological disasters and comprehensively rectifying the mining environment.
4.2 Work content
4.2.1 Remote sensing monitoring of mineral resources planning
In comparison with the overall planning of mineral resources, use the second phase (latest phase data, planning base year data) to remotely monitor images, monitor restrictions, prohibitions, etc.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 31 pages — is available in the English PDF.
Referenced standards
Normative references
GB/T 17695 · GB 14512
How to Download DZ/T 0266-2014
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
DZ/T 0071-2025 — Technical regulations for high-precision ground magnetic survey
DZ/T 0199-2025 — Specifications for Mineral Geological Exploration - Uranium
DZ/T 0325-2025 — Specifications for mineral geological exploration - Gypsum, lapis lazuli, diatomaceous earth
Secure payment via Stripe
Payments accepted
DZ/T 0266-2014
$570.00