Valid

DZ/T 0155-1995Rules of construction for drill-pouring piles (English PDF)

钻孔灌注桩施工规程

Preview PDF

This is a limited preview

Buy now to download the full PDF (58 pages)

Need quotation for your management?

Get a formal quotation for DZ/T 0155-1995 in 30 minutes.

Issued by

Ministry of Land and Resources

Level / Type

National · Recommended

Issue date

September 14, 1995

Implementation date

March 1, 1996

Scope

DZ/T 0155-1995 is the English-translated version of 钻孔灌注桩施工规程.

DZ/T 0155-1995 — This standard specifies the requirements for the technical work of bored pile construction and related production process operation requirements.

Found what you need?

Document preview — DZ/T 0155-1995

National Standard of the People's Republic of China

Classification
D 81

Contents

  • What this standard covers1
  • Document data2

What this standard covers

This standard specifies the requirements for the technical work of bored pile construction and related production process operation requirements. This standard applies to industrial and civil construction, heavy facilities, piers, bridges, ports and other structures on land or waters of bored pile foundation construction; also applies to the bored pile retaining control landslides and slope ramp pile, belled piles, tree piles and other special construction.

Document data

Chinese classification (CCS): D81.

Estimated length of the Chinese original: 87,877 words.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 58 pages — is available in the English PDF.

Referenced standards

How to Download DZ/T 0155-1995

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
58 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

DZ/T 0155-1995

$1,000.00