DL/Z 713-2000Immunity requirement for protection and control equipment in 500kV substation (English PDF)
500kV变电所保护和控制设备抗扰度要求
DL/Z 713 | Evolution and historical versions
| Std ID | Title | Status |
|---|---|---|
| DL/T 713-2025 | Immunity requirements for protection and control equipment in substations of 500kV and above | Valid |
| DL/Z 713-2000 | Immunity requirement for protection and control equipment in 500kV substation | Obsolete |
DL/Z 713-2000 is obsolete. It has been replaced by DL/T 713-2025. This page sells the obsolete edition, for projects and contracts that still cite it.
This is a limited preview
Buy now to download the full PDF
Need quotation for your management?
Get a formal quotation for DL/Z 713-2000 in 30 minutes.
Issued by
State Economic and Trade Commission
Level / Type
National · Recommended
Issue date
November 3, 2000
Implementation date
January 1, 2001
Scope
DL/Z 713-2000 is the English-translated version of 500kV变电所保护和控制设备抗扰度要求.
DL/Z 713-2000 is the Chinese industry standard "Immunity requirement for protection and control equipment in 500kV substation". It was issued on November 3, 2000 by the State Economic and Trade Commission, and took effect on January 1, 2001. It is obsolete: it has been replaced by DL/T 713-2025.
Found what you need?
Document preview — DL/Z 713-2000
National Standard of the People's Republic of China
Issued by: State Economic and Trade Commission
Contents
- Document data
1 Document data
Sector: National Guiding (industry standard).
Issuing body: State Economic and Trade Commission.
Date of issue: 2000-11-03.
Date of implementation: 2001-01-01.
Status: obsolete, replaced by DL/T 713-2025.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.
How to Download DL/Z 713-2000
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
DL/Z 890.6001-2019 — Energy management system application program interface (EMS-API) - Part 600-1: Common grid model exchange specification (CGMES) - Structure and rules
DL/Z 1080.2-2018 — Power Enterprise Application Integration Distribution Management System Interface Part 2: Terminology
DL/Z 1812-2018 — Guidelines for the selection of low-power capacitive voltage transformers
Secure payment via Stripe
Payments accepted
DL/Z 713-2000
$225.00