Withdrawn

DL/T 968-2005Code of start-up and completion acceptance for HVDC transmission project (English PDF)

高压直流输电工程启动及竣工验收规程

Preview PDF

DL/T 968 | Evolution and historical versions

Std IDTitleStatus
DL/T 968-2005Code of start-up and completion acceptance for HVDC transmission projectObsolete

DL/T 968-2005 is obsolete. This page sells the obsolete edition, for projects and contracts that still cite it.

This is a limited preview

Buy now to download the full PDF

Need quotation for your management?

Get a formal quotation for DL/T 968-2005 in 30 minutes.

Issued by

National Development and Reform Commission

Level / Type

National · Recommended

Issue date

November 28, 2005

Implementation date

June 1, 2006

Scope

DL/T 968-2005 is the English-translated version of 高压直流输电工程启动及竣工验收规程.

DL/T 968-2005 is the Chinese industry standard "Code of start-up and completion acceptance for HVDC transmission project". It was issued on November 28, 2005 by the National Development and Reform Commission, and took effect on June 1, 2006. It is obsolete: it has been withdrawn (abolished on January 14, 2015).

Found what you need?

Document preview — DL/T 968-2005

National Standard of the People's Republic of China

Issued by: National Development and Reform Commission

Contents

  • Document data
1 Document data

Sector: Electricity & Power (industry standard).

Issuing body: National Development and Reform Commission.

Date of issue: 2005-11-28.

Date of implementation: 2006-06-01.

Status: obsolete, withdrawn on 2015-01-14.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.

How to Download DL/T 968-2005

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

DL/T 968-2005

$495.00