Valid

DL/T 860.93-2019Power automation communication networks and systems. Part 9-3: Power automation system precise time protocol subset (English PDF)

电力自动化通信网络和系统 第9-3部分:电力自动化系统精确时间协议子集

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for DL/T 860.93-2019 in 30 minutes.

Issued by

National Energy Administration

Level / Type

National · Recommended

Issue date

January 1, 2019

Implementation date

January 1, 2019

Scope

DL/T 860.93-2019 is the English-translated version of 电力自动化通信网络和系统 第9-3部分:电力自动化系统精确时间协议子集.

DL/T 860.93-2019 is the Chinese standard "Power automation communication networks and systems. Part 9-3: Power automation system precise time protocol subset".

Found what you need?

Document preview — DL/T 860.93-2019

National Standard of the People's Republic of China

ICS
29.240.01

1 Foreword

DL/T 860.93-2019 was issued by National Energy Administration on 4 November 2019.

It is one of 15 parts of the DL/T 860 series.

2 About this standard

Issued by: National Energy Administration

English translation: about 15 pages (approximate)

3 Related standards

Other parts of this standard:

DL/T 860.3-2004 — Communication networks and systems in substations. Part 3: General requirements

DL/T 860.4-2018 — Power automation communication networks and systems - Part 4: Systems and project management

DL/T 860.5-2006 — Communication networks and systems in substations. Part 5: Communication requirements for functions and device models

DL/T 860.10-2018 — Communication networks and systems for power utility automation -Part 10: Conformance testing

DL/T 860.71-2014 — Communication Networks and Systems in Substations - Part 7-1: Basic Communication Structure Principles and Models

DL/T 860.74-2014 — Communication Networks and Systems in Substations - Part 7-4: Basic Communication Structure for Compatible Logical Node Classes and Data Classes

DL/T 860.81-2016 — Electric power automation communication networks and systems - Part 8-1: particular communication service mapping (SCSM) - mapping to MMS (ISO 9506-1 and ISO 9506-2) and ISO/IEC 8802-3

DL/T 860.92-2016 — Communication networks and systems for power utility automation Part 9-2: Specific Communication Service Mapping(SCSM)-Sampled values over ISO/IEC 8802-3

DL/T 860.801-2016 — Power automation communication networks and systems - Part 80-1: application of DL/T 634.5101 or DL/T 634.5104 exchange of data model information based on CDC

DL/T 860.901-2014 — Electric Power Automation Communication Network and System - Part 901: DL/T860 Application in Substation Communication

DL/T 860.904-2018 — Power automation communication networks and systems - Part 90-4: Network engineering guide

DL/T 860.905-2019 — Communication networks and systems for power utility automation Part 90-5: Use of IEC 61850 to transmit synchrophasor imformation according to IEEE C37.118

DL/T 860.7410-2016 — Communication networks and systems for power utility automation. Part 7-410: Basic communication structure-Hydroelectric power plants-Communication for monitoring and control

DL/T 860.7420-2012 — Communication networks and systems for power utility automation. Part 7-420: Basic communication structure. Distributed energy resources logical nodes

4 Classification and status

International classification (ICS): 29.240.01

Prefix DL/T: recommended standard.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

How to Download DL/T 860.93-2019

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

DL/T 860.93-2019

$195.00