DL/T 698.1-2021Data acquisition and management system for electrical energy - Part 1: General consideration (English PDF)
电能信息采集与管理系统 第1部分:总则
DL/T 698.1 | Evolution and historical versions
| Std ID | Title | Status |
|---|---|---|
| DL/T 698.1-2025 | Energy measurement monitoring and control system - Part 1 :General principles | Valid |
| DL/T 698.1-2021 | Data acquisition and management system for electrical energy - Part 1: General consideration | Obsolete |
DL/T 698.1-2021 is obsolete. It has been replaced by DL/T 698.1-2025. This page sells the obsolete edition, for projects and contracts that still cite it.
This is a limited preview
Buy now to download the full PDF
Need quotation for your management?
Get a formal quotation for DL/T 698.1-2021 in 30 minutes.
Issued by
National Energy Administration
Level / Type
National · Recommended
Issue date
January 7, 2021
Implementation date
July 1, 2021
Scope
DL/T 698.1-2021 is the English-translated version of 电能信息采集与管理系统 第1部分:总则.
DL/T 698.1-2021 is the Chinese industry standard "Data acquisition and management system for electrical energy - Part 1: General consideration". It was issued on January 7, 2021 by the National Energy Administration, and took effect on July 1, 2021. It is obsolete: it has been replaced by DL/T 698.1-2025.
Found what you need?
Document preview — DL/T 698.1-2021
National Standard of the People's Republic of China
Issued by: National Energy Administration
Contents
- Document data
1 Document data
Sector: Electricity & Power (industry standard).
Issuing body: National Energy Administration.
Date of issue: 2021-01-07.
Date of implementation: 2021-07-01.
Status: obsolete, replaced by DL/T 698.1-2025.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.
How to Download DL/T 698.1-2021
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
DL/T 698.2-2010 — Data acquisition and management system for electrical energy. Part 2: Technical specification of master station
DL/T 698.31-2010 — Data acquisition and management system for electrical energy. Part 3-1: Technical specification of electrical energy data acquisition terminal. General requirement
DL/T 698.32-2010 — Data acquisition and management system for electrical energy. Part 3-2: Technical specification of electrical energy data acquisition terminal-special requirement for data acquisition terminal of power station and substation
Secure payment via Stripe
Payments accepted
DL/T 698.1-2021
$150.00