DL/T 651-1998Requirements for hydrogen humidity of generators using hydrogen as a coolant (English PDF)
氢冷发电机氢气湿度的技术要求
DL/T 651 | Evolution and historical versions
| Std ID | Title | Status |
|---|---|---|
| DL/T 651-2017 | Requirements for hydrogen humidity of hydrogen-cooled generators | Valid |
| DL/T 651-1998 | Requirements for hydrogen humidity of generators using hydrogen as a coolant | Obsolete |
DL/T 651-1998 is obsolete. It has been replaced by DL/T 651-2017. This page sells the obsolete edition, for projects and contracts that still cite it.
This is a limited preview
Buy now to download the full PDF
Need quotation for your management?
Get a formal quotation for DL/T 651-1998 in 30 minutes.
Issued by
Ministry of Electric Power Industry
Level / Type
National · Recommended
Issue date
March 19, 1998
Implementation date
September 1, 1998
Scope
DL/T 651-1998 is the English-translated version of 氢冷发电机氢气湿度的技术要求.
DL/T 651-1998 is the Chinese industry standard "Requirements for hydrogen humidity of generators using hydrogen as a coolant". It was issued on March 19, 1998 by the Ministry of Electric Power Industry, and took effect on September 1, 1998. It is obsolete: it has been replaced by DL/T 651-2017.
Found what you need?
Document preview — DL/T 651-1998
National Standard of the People's Republic of China
Issued by: Ministry of Electric Power Industry
Contents
- Document data
1 Document data
Sector: Electricity & Power (industry standard).
Issuing body: Ministry of Electric Power Industry.
Date of issue: 1998-03-19.
Date of implementation: 1998-09-01.
Status: obsolete, replaced by DL/T 651-2017.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.
How to Download DL/T 651-1998
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
DL/T 5458-2026 — Regulations for content and depth of detailed design of substation project
DL/T 1010.3-2025 — High voltage static reactive power compensation devices - Part 3: Control and protection system
DL/T 1078-2025 — Test specification for operating performance of surface condenser
Secure payment via Stripe
Payments accepted
DL/T 651-1998
$165.00