DL/T 5580.3-2023Calculation of biomass energy quantity for coal-fired coupled biomass power generation - Part 3: Steam coupling of agricultural and forestry waste residues (English PDF)
燃煤耦合生物质发电生物质能电量计算 第3部分:农林废弃残余物蒸汽耦合
This is a limited preview
Buy now to download the full PDF (28 pages)
Need quotation for your management?
Get a formal quotation for DL/T 5580.3-2023 in 30 minutes.
Issued by
National Energy Administration
Level / Type
National · Recommended
Issue date
December 28, 2023
Implementation date
June 28, 2024
Scope
DL/T 5580.3-2023 is the English-translated version of 燃煤耦合生物质发电生物质能电量计算 第3部分:农林废弃残余物蒸汽耦合.
DL/T 5580.3-2023 — Calculation of biomass energy quantity for coal-fired coupled biomass power generation - Part 3: Steam coupling of agricultural and forestry waste residues
Found what you need?
Document preview — DL/T 5580.3-2023
National Standard of the People's Republic of China
- ICS
- 27.100
- Classification
- P 60
Issued by: National Energy Administration
Contents
- Document data1
Document data
International classification (ICS): 27.100.
Chinese classification (CCS): P60.
Estimated length of the Chinese original: 42,481 words.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 28 pages — is available in the English PDF.
How to Download DL/T 5580.3-2023
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
DL/T 5580.1-2020 — Coal-fired coupling biomass power generation biomass energy power calculation - Part 1: Agricultural and forestry waste gasification coupling (with instructions)
DL/T 1010.3-2025 — High voltage static reactive power compensation devices - Part 3: Control and protection system
DL/T 1078-2025 — Test specification for operating performance of surface condenser
Secure payment via Stripe
Payments accepted
DL/T 5580.3-2023
$560.00