DL/T 5575-2020Code for design of wide area measurement system (English PDF)
广域测量系统设计规程
This is a limited preview
Buy now to download the full PDF (21 pages)
Need quotation for your management?
Get a formal quotation for DL/T 5575-2020 in 30 minutes.
Issued by
National Energy Administration
Level / Type
National · Recommended
Issue date
October 23, 2020
Implementation date
February 1, 2021
Scope
DL/T 5575-2020 is the English-translated version of 广域测量系统设计规程.
DL/T 5575-2020 — This standard applies to power system wide-area measurement system planning, feasibility study, engineering design; power plant, substation, converter station engineering related parts of the wide-area measurement system design.
Found what you need?
Document preview — DL/T 5575-2020
National Standard of the People's Republic of China
- ICS
- 29.240
- Classification
- F 21
Issued by: National Energy Administration
Contents
- What this standard covers1
- Document data2
- Standards quoted by this document3
What this standard covers
This standard applies to power system wide-area measurement system planning, feasibility study, engineering design; power plant, substation, converter station engineering related parts of the wide-area measurement system design. The design of the wide-area measurement system shall not only implement the provisions of this standard, but also comply with the provisions of relevant national standards.
Document data
International classification (ICS): 29.240.
Chinese classification (CCS): F21.
Estimated length of the Chinese original: 32,374 words.
Standards quoted by this document
GB/T 22386; GB/T 26865.2; GB/T 36572; DL/T 5003; DL/T 860
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 21 pages — is available in the English PDF.
How to Download DL/T 5575-2020
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
DL/T 1010.3-2025 — High voltage static reactive power compensation devices - Part 3: Control and protection system
DL/T 1078-2025 — Test specification for operating performance of surface condenser
DL/T 1081-2025 — Operating code for 12kV~40.5kV outdoor high voltage switchgear
Secure payment via Stripe
Payments accepted
DL/T 5575-2020
$480.00