DL/T 5528-2017Guidelines for working drawing estimate settlement auditing of transmission and transformer project (English PDF)
输变电工程结算审核报告编制导则
DL/T 5528 | Evolution and historical versions
| Std ID | Title | Status |
|---|---|---|
| DL/T 5528-2025 | Guidelines for working drawing estimate settlement auditing of transmission and transformer project | Valid |
| DL/T 5528-2017 | Guidelines for working drawing estimate settlement auditing of transmission and transformer project | Obsolete |
DL/T 5528-2017 is obsolete. It has been replaced by DL/T 5528-2025. This page sells the obsolete edition, for projects and contracts that still cite it.
This is a limited preview
Buy now to download the full PDF
Need quotation for your management?
Get a formal quotation for DL/T 5528-2017 in 30 minutes.
Issued by
China Energy Aminidstration
Level / Type
National · Recommended
Issue date
March 28, 2017
Implementation date
August 1, 2017
Scope
DL/T 5528-2017 is the English-translated version of 输变电工程结算审核报告编制导则.
DL/T 5528-2017 is the Chinese industry standard "Guidelines for working drawing estimate settlement auditing of transmission and transformer project". It was issued on March 28, 2017 by China Energy Aminidstration, and took effect on August 1, 2017. It is obsolete: it has been replaced by DL/T 5528-2025.
Found what you need?
Document preview — DL/T 5528-2017
National Standard of the People's Republic of China
Issued by: China Energy Aminidstration
Contents
- Document data
1 Document data
Sector: Electricity & Power (industry standard).
Issuing body: China Energy Aminidstration.
Date of issue: 2017-03-28.
Date of implementation: 2017-08-01.
Status: obsolete, replaced by DL/T 5528-2025.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.
How to Download DL/T 5528-2017
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
DL/T 1008-2026 — Functional specification for technical support system of medium and long term electricity trading
DL/T 1027-2026 — Code for testing of wet cooling towers
DL/T 1041-2026 — Guide for on-site tests of electromagnetic transients in power systems
DL/T 5528-2017
$535.00