DL/T 5439-2009Design regulations of content and profundity for hydro and fossil fuel power plant connecting to the system (English PDF)

大型水、火电厂接入系统设计内容深度规定

Preview PDF

DL/T 5439 | Evolution and historical versions

Std IDTitleStatus
DL/T 5439-2021Design regulations of content and profundity for power connecting to the systemValid
DL/T 5439-2009Design regulations of content and profundity for hydro and fossil fuel power plant connecting to the systemObsolete

DL/T 5439-2009 is obsolete. It has been replaced by DL/T 5439-2021. This page sells the obsolete edition, for projects and contracts that still cite it.

This is a limited preview

Buy now to download the full PDF

Need quotation for your management?

Get a formal quotation for DL/T 5439-2009 in 30 minutes.

Issued by

MEPRC

Level / Type

National · Recommended

Issue date

July 22, 2009

Implementation date

December 1, 2009

Scope

DL/T 5439-2009 is the English-translated version of 大型水、火电厂接入系统设计内容深度规定.

DL/T 5439-2009 is the Chinese industry standard "Design regulations of content and profundity for hydro and fossil fuel power plant connecting to the system". It was issued on July 22, 2009 by MEPRC, and took effect on December 1, 2009. It is obsolete: it has been replaced by DL/T 5439-2021.

Found what you need?

Document preview — DL/T 5439-2009

National Standard of the People's Republic of China

Issued by: MEPRC

Contents

  • Document data
1 Document data

Sector: Electricity & Power (industry standard).

Issuing body: MEPRC.

Date of issue: 2009-07-22.

Date of implementation: 2009-12-01.

Status: obsolete, replaced by DL/T 5439-2021.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.

How to Download DL/T 5439-2009

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

DL/T 5439-2009

$285.00