DL/T 5437-2009Code for fossil power construction project from the unit commissioning to completed acceptance (English PDF)
火力发电建设工程启动试运及验收规程
DL/T 5437 | Evolution and historical versions
| Std ID | Title | Status |
|---|---|---|
| DL/T 5437-2022 | Code for fossil power construction project from unit startup to acceptance | Valid |
| DL/T 5437-2009 | Code for fossil power construction project from the unit commissioning to completed acceptance | Obsolete |
DL/T 5437-2009 is obsolete. It has been replaced by DL/T 5437-2022. This page sells the obsolete edition, for projects and contracts that still cite it.
This is a limited preview
Buy now to download the full PDF
Need quotation for your management?
Get a formal quotation for DL/T 5437-2009 in 30 minutes.
Issued by
National Energy Administration
Level / Type
National · Recommended
Issue date
July 22, 2009
Implementation date
December 1, 2009
Scope
DL/T 5437-2009 is the English-translated version of 火力发电建设工程启动试运及验收规程.
DL/T 5437-2009 is the Chinese industry standard "Code for fossil power construction project from the unit commissioning to completed acceptance". It was issued on July 22, 2009 by the National Energy Administration, and took effect on December 1, 2009. It is obsolete: it has been replaced by DL/T 5437-2022.
Found what you need?
Document preview — DL/T 5437-2009
National Standard of the People's Republic of China
Issued by: National Energy Administration
Contents
- Document data
1 Document data
Sector: Electricity & Power (industry standard).
Issuing body: National Energy Administration.
Date of issue: 2009-07-22.
Date of implementation: 2009-12-01.
Status: obsolete, replaced by DL/T 5437-2022.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.
Referenced standards
How to Download DL/T 5437-2009
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
DL/T 1008-2026 — Functional specification for technical support system of medium and long term electricity trading
DL/T 1027-2026 — Code for testing of wet cooling towers
DL/T 1041-2026 — Guide for on-site tests of electromagnetic transients in power systems
DL/T 5437-2009
$205.00