Valid

DL/T 5420-2009Technological guide for stator assembly in site of hydro-generators (English PDF)

水轮发电机定子现场装配工艺

Preview PDF

This is a limited preview

Buy now to download the full PDF (51 pages)

Need quotation for your management?

Get a formal quotation for DL/T 5420-2009 in 30 minutes.

Issued by

National Energy Administration

Level / Type

National · Recommended

Issue date

July 22, 2009

Implementation date

December 1, 2009

Scope

DL/T 5420-2009 is the English-translated version of 水轮发电机定子现场装配工艺.

DL/T 5420-2009 — This standard specifies the unit capacity of 15MW and above in the field Stator assembly process methods, technical requirements, operation (construction) procedures and inspection standards for power plant site in Stator Block welding machine the overall stacked core and complete all work in embedded line winding assembly.

This standard does not apply to the split -site assembly of the stator or generator equipment factory assembled and transported to the site as a whole stator assembly process.

1. 0. 2 This standard is referred Stator Stator conventional full- cooled, cooled Stator, bulb turbine stators and reversible pumped storage power generator motor the stator. 1. 0.

Found what you need?

Document preview — DL/T 5420-2009

National Standard of the People's Republic of China

ICS
29.160.20
Classification
K 21
Replacing
SD 287-1988

Issued by: National Energy Administration

Contents

  • What this standard covers1
  • Document data2
  • Standards quoted by this document3

What this standard covers

This standard specifies the unit capacity of 15MW and above in the field Stator assembly process methods, technical requirements, operation (construction) procedures and inspection standards for power plant site in Stator Block welding machine the overall stacked core and complete all work in embedded line winding assembly. This standard does not apply to the split -site assembly of the stator or generator equipment factory assembled and transported to the site as a whole stator assembly process. 1. 0. 2 This standard is referred Stator Stator conventional full- cooled, cooled Stator, bulb turbine stators and reversible pumped storage power generator motor the stator. 1. 0. 3 Stand-alone capacity of less than 15MW turbine generator stator field assembly process requirements can refer to the corresponding provisions of the implementation of this standard.

Document data

International classification (ICS): 29.160.20.

Chinese classification (CCS): K21.

Estimated length of the Chinese original: 76,778 words.

Supersedes the earlier edition SD 287-1988.

Standards quoted by this document

GB/T 8564; GB/T 20835; JB/T 8660

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 51 pages — is available in the English PDF.

Referenced standards

How to Download DL/T 5420-2009

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
51 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

DL/T 5420-2009

$455.00