DL/T 5409.4-2010Technical code for engineering investigation of nuclear power plants. Part 4: Surveying (English PDF)
核电厂工程勘测技术规程 第4部分:测量
This is a limited preview
Buy now to download the full PDF (131 pages)
Need quotation for your management?
Get a formal quotation for DL/T 5409.4-2010 in 30 minutes.
Issued by
National Energy Administration
Level / Type
National · Recommended
Issue date
May 24, 2010
Implementation date
October 1, 2010
Scope
DL/T 5409.4-2010 is the English-translated version of 核电厂工程勘测技术规程 第4部分:测量.
DL/T 5409.4-2010 — This standard specifies the nuclear power plant and ancillary facilities to measure the basic technical requirements. This section applies to nuclear power plants and their ancillary facilities planning and design phase, construction phase engineering measurements.
Found what you need?
Document preview — DL/T 5409.4-2010
National Standard of the People's Republic of China
- ICS
- 27.140
- Classification
- P 59
Issued by: National Energy Administration
Contents
- What this standard covers1
- Document data2
- Standards quoted by this document3
What this standard covers
This standard specifies the nuclear power plant and ancillary facilities to measure the basic technical requirements. This section applies to nuclear power plants and their ancillary facilities planning and design phase, construction phase engineering measurements. Operation and management phase measurements can refer to this part of the implementation.
Document data
International classification (ICS): 27.140.
Chinese classification (CCS): P59.
Estimated length of the Chinese original: 199,183 words.
Standards quoted by this document
GB/T 20257.1; GB/T 7931; GB 12319; GB/T 12897; GB/T 12898; GB/T 13977; GB/T 15967; GB/T 18316; GB/T 20257.2; GB 50026; JGJ 8; DL/T 5001
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 131 pages — is available in the English PDF.
How to Download DL/T 5409.4-2010
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
DL/T 1010.3-2025 — High voltage static reactive power compensation devices - Part 3: Control and protection system
DL/T 1078-2025 — Test specification for operating performance of surface condenser
DL/T 1081-2025 — Operating code for 12kV~40.5kV outdoor high voltage switchgear
Secure payment via Stripe
Payments accepted
DL/T 5409.4-2010
$1,250.00