DL/T 5361-2006Code for model test of river diversion and closure during construction for hydropower and hydraulic engineering (English PDF)
This is a limited preview
Buy now to download the full PDF (23 pages)
Need quotation for your management?
Get a formal quotation for DL/T 5361-2006 in 30 minutes.
Issued by
National Development and Reform Commission
Level / Type
National · Recommended
Issue date
December 17, 2006
Implementation date
May 1, 2007
Scope
DL/T 5361-2006 (Code for model test of river diversion and closure during construction for hydropower and hydraulic engineering) is available as an English-translated PDF.
DL/T 5361-2006 — This standard specifies the construction of hydropower and water diversion and closure model test the basic requirements.
Found what you need?
Document preview — DL/T 5361-2006
National Standard of the People's Republic of China
- ICS
- 93.020
- Classification
- P 59
Issued by: National Development and Reform Commission
Contents
- What this standard covers1
- Document data2
- Standards quoted by this document3
What this standard covers
This standard specifies the construction of hydropower and water diversion and closure model test the basic requirements. This standard applies to large and medium hydropower and water conservancy construction guide closure model test, other similar projects can be implemented by reference.
Document data
International classification (ICS): 93.020.
Chinese classification (CCS): P59.
Estimated length of the Chinese original: 34,312 words.
Standards quoted by this document
DL/T 5173; SDJ 338
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 23 pages — is available in the English PDF.
How to Download DL/T 5361-2006
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
DL/T 1210-2025 — Code for Testing and Acceptance of Automatic Generation Control Performance of Thermal Power Plant
DL/T 1332-2025 — Guidelines for on-site low-frequency test of excitation characteristic of the current transformer
DL/T 2875.1-2025 — Technical specification for dust suppression of coal transportation equipment in thermal power plants - Part 1: General provisions
Secure payment via Stripe
Payments accepted
DL/T 5361-2006
$864.00