DL/T 5205-2011Code of valuation with bill quantity of electric power construction works Transmission line project (English PDF)
电力建设工程 工程量清单计价规范-输电线路工程
DL/T 5205 | Evolution and historical versions
| Std ID | Title | Status |
|---|---|---|
| DL/T 5205-2021 | Standard method of measurement for transmission line project | Obsolete |
| DL/T 5205-2016 | Standard method of measurement for transmission line project | Obsolete |
| DL/T 5205-2011 | Code of valuation with bill quantity of electric power construction works Transmission line project | Obsolete |
DL/T 5205-2011 is obsolete. It has been replaced by DL/T 5205-2016. This page sells the obsolete edition, for projects and contracts that still cite it.
This is a limited preview
Buy now to download the full PDF
Need quotation for your management?
Get a formal quotation for DL/T 5205-2011 in 30 minutes.
Issued by
MEPRC
Level / Type
National · Recommended
Issue date
July 28, 2011
Implementation date
November 1, 2011
Scope
DL/T 5205-2011 is the English-translated version of 电力建设工程 工程量清单计价规范-输电线路工程.
DL/T 5205-2011 is the Chinese industry standard "Code of valuation with bill quantity of electric power construction works Transmission line project". It was issued on July 28, 2011 by MEPRC, and took effect on November 1, 2011. It is obsolete: it has been replaced by DL/T 5205-2016.
Found what you need?
Document preview — DL/T 5205-2011
National Standard of the People's Republic of China
Issued by: MEPRC
Contents
- Document data
1 Document data
Sector: Electricity & Power (industry standard).
Issuing body: MEPRC.
Date of issue: 2011-07-28.
Date of implementation: 2011-11-01.
Status: obsolete, replaced by DL/T 5205-2016.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.
How to Download DL/T 5205-2011
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
DL/T 1008-2026 — Functional specification for technical support system of medium and long term electricity trading
DL/T 1027-2026 — Code for testing of wet cooling towers
DL/T 1041-2026 — Guide for on-site tests of electromagnetic transients in power systems
DL/T 5205-2011
$2,540.00