Valid

DL/T 5115-2016Technical code for joint seal of concrete face rockfill dam (English PDF)

混凝土面板堆石坝接缝止水技术规范

Preview PDF

This is a limited preview

Buy now to download the full PDF (47 pages)

Need quotation for your management?

Get a formal quotation for DL/T 5115-2016 in 30 minutes.

Issued by

National Energy Administration

Level / Type

National · Recommended

Issue date

December 5, 2016

Implementation date

May 1, 2017

Scope

DL/T 5115-2016 is the English-translated version of 混凝土面板堆石坝接缝止水技术规范.

DL/T 5115-2016 — This standard applies to water conservancy and hydropower projects in 1, 2, 3 and 50m above the level 4 and 5 concrete faced rockfill dam.

Found what you need?

Document preview — DL/T 5115-2016

National Standard of the People's Republic of China

ICS
27.140
Classification
P 59
Replacing
DL/T 5115-2008

Issued by: National Energy Administration

Contents

  • What this standard covers1
  • Document data2
  • Standards quoted by this document3

What this standard covers

This standard applies to water conservancy and hydropower projects in 1, 2, 3 and 50m above the level 4 and 5 concrete faced rockfill dam.

Document data

International classification (ICS): 27.140.

Chinese classification (CCS): P59.

Estimated length of the Chinese original: 71,728 words.

Supersedes the earlier edition DL/T 5115-2008.

Standards quoted by this document

GB/T 2059; GB/T 3280; GB/T 17638; GB/T 17639; GB 18173.1; GB 18173.2; DL/T 5144; DL/T 5215-2005; DL/T 949; NB/T 35026

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 47 pages — is available in the English PDF.

How to Download DL/T 5115-2016

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
47 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

DL/T 5115-2016

$1,500.00