Valid

DL/T 5113.11-2005Quality degree evaluate standard of unit engineering for hydropower and water conservancy construction engineering. Part 11: Bulb turbine and generator units installation engineering (English PDF)

水电水利基本建设工程 单工程质量等级评定标准 第11部分:灯泡贯流式水轮发电机组安装工程

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for DL/T 5113.11-2005 in 30 minutes.

Issued by

National Energy Administration

Level / Type

National · Recommended

Issue date

January 1, 2005

Implementation date

January 1, 2005

Scope

DL/T 5113.11-2005 is the English-translated version of 水电水利基本建设工程 单工程质量等级评定标准 第11部分:灯泡贯流式水轮发电机组安装工程.

DL/T 5113.11-2005 is the Chinese standard "Quality degree evaluate standard of unit engineering for hydropower and water conservancy construction engineering. Part 11: Bulb turbine and generator units installation engineering".

Found what you need?

Document preview — DL/T 5113.11-2005

National Standard of the People's Republic of China

ICS
29.160.20

Contents

  • [Preview only]
  • 1 Scope
  • 2 Normative References
  • 3 Terms and Definitions
  • 3.1 Basic Names
  • 3.2 Connection (Interconnection) Part
  • 3.3 Operation and Control
  • 3.4 Security
  • 3.5 Others
  • 4 Ratings
  • 4.1 Primary Part
  • 4.2 Secondary Part
  • 4.3 Classification by service environment
  • 5 Design and Construction
  • 5.1 Connection Procedure
  • 5.2 Technical Characteristics and Operation Characteristics of Power Grid to Meet
  • 5.3 Universal Technical Conditions of Connection (Interconnection)
  • 5.4 Classified Connection (Interconnection) Clauses
  • 5.5 Start of New Equipments
  • 5.6 Synchronous grid connection after power supply restoration
  • 5.7 Protection functions
  • 5.8 Communication
  • 5.9 Operation information monitoring
  • 6 Grid Operation
  • 6.1 General
  • 6.2 Load Prediction
  • 6.3 Equipment Maintenance
  • 6.4 Power Generation and Utilization Balancing
  • 6.5 Ancillary Services
  • 6.6 Frequency and Voltage Control
  • 6.7 Load Control
  • 6.9 Stability and Security Countermeasures of System
  • 7 Routine Tests
  • 7.1 Electrical safety
  • 7.2 Temperature rise
  • 7.3 Environmental adaptability
  • 7.4 Mechanical protection
  • 8 Flashover or Withstand Characteristic of Insulators
  • 8.1 Electromagnetic disturbance limits
  • 8.2 Immunity test levels
  • 9 Information to Be Given with Enquiries, Tenders and Orders
  • 9.1 Cooling system
  • 9.2 Auxiliary power supply

1 Foreword

DL/T 5113.11-2005 was issued by National Energy Administration on 28 November 2005.

It is one of 16 parts of the DL/T 5113 series.

The DL/T prefix marks a recommended standard. It is not law in itself: it becomes binding when a contract names it, when a regulation or a mandatory standard refers to it, or when a producer declares conformity with it.

2 Scope Preview

DL/T 5113.11-2005 falls under ICS 29.160.20, in the field of electrical engineering.

This catalogue holds 883 other DL/T standards in that field.

In this catalogue, DL/T standards carry edition years from 1991 to 2026.

3 About this standard

Issued by: National Energy Administration

English translation: about 15 pages (approximate)

4 Related standards

Other parts of this standard:

DL/T 5113.1-2005 — Part 1: Civil department

DL/T 5113.1-2019 — Hydropower and water conservancy basic construction engineering unit engineering quality grading standard Part 1: Civil engineering

DL/T 5113.3-2012 — Part 3: Turbine and generator units installation engineering

DL/T 5113.4-2012 — Quality degree evalulate standard of unit engineering for hydropower and water conservancy construction engineering. Part 4: Auxiliary equipment of hydraulic machinery installation engineering

DL/T 5113.5-2012 — Part 5: Electric generation equipment installation engineering

DL/T 5113.6-2012 — Part 6: Step-up substation electrical equipment installation engineering

DL/T 5113.7-2015 — Quality grade evaluation standard of unit engineering for hydropower and water conservancy construction engineering Part 7: Rolled earth-rock dam

DL/T 5113.8-2000 — Quality degree evaluate standard of unit engineering for hydro power and water conservancy construction engineering (eight). Hydraulic roller compacted concrete engineering

DL/T 5113.8-2012 — Part 8: Hydraulic roller compacted concrete engineering

DL/T 5113.9-2017 — Quality grade evaluation standard of unit engineering for hydropower and water resources construction engineering - Part 9: Geosynthetics appliction engineering

DL/T 5113.10-2012 — Part 10: Bituminous concrete engineering

DL/T 5113.10-2024 — Quality rating standard for unit projects of hydropower and water conservancy infrastructure projects - Part 10: Asphalt concrete engineering

DL/T 5113.13-2019 — Hydropower and water conservancy basic construction engineering unit engineering quality grading standard Part 13: masonry dam project

DL/T 5113.14-2018 — Quality grade evaluation standard of unit engineering for hydropower and water conservancy construction engineering Part 14:Concrete face rockfill dam project

DL/T 5113.15-2023 — Quality Grade Assessment Standards for Hydropower and Water Conservancy Capital Construction Project Unit Projects - Part 15: Safety Monitoring Projects

5 Classification and status

International classification (ICS): 29.160.20

Chinese Standard Classification (CCS): F 22

Prefix DL/T: recommended standard.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

How to Download DL/T 5113.11-2005

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

DL/T 5113.11-2005

$285.00