DL/T 399-2010Supervision guide for main electric equipments of ±800kV and under DC transmission projects (English PDF)

±800kV及以下直流输电工程主要设备监理导则

Preview PDF

DL/T 399 | Evolution and historical versions

Std IDTitleStatus
DL/T 399-2020Supervision guide for main electric equipment of DC transmission projectsValid
DL/T 399-2010Supervision guide for main electric equipments of ±800kV and under DC transmission projectsObsolete

DL/T 399-2010 is obsolete. It has been replaced by DL/T 399-2020. This page sells the obsolete edition, for projects and contracts that still cite it.

This is a limited preview

Buy now to download the full PDF

Need quotation for your management?

Get a formal quotation for DL/T 399-2010 in 30 minutes.

Issued by

National Energy Administration

Level / Type

National · Recommended

Issue date

May 1, 2010

Implementation date

October 1, 2010

Scope

DL/T 399-2010 is the English-translated version of ±800kV及以下直流输电工程主要设备监理导则.

DL/T 399-2010 is the Chinese industry standard "Supervision guide for main electric equipments of ±800kV and under DC transmission projects". It was issued on May 1, 2010 by the National Energy Administration, and took effect on October 1, 2010. It is obsolete: it has been replaced by DL/T 399-2020.

Found what you need?

Document preview — DL/T 399-2010

National Standard of the People's Republic of China

Issued by: National Energy Administration

Contents

  • Document data
1 Document data

Sector: Electricity & Power (industry standard).

Issuing body: National Energy Administration.

Date of issue: 2010-05-01.

Date of implementation: 2010-10-01.

Status: obsolete, replaced by DL/T 399-2020.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.

How to Download DL/T 399-2010

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

DL/T 399-2010

$800.00