DL/T 324-2024Communication protocol for dam safety monitoring automation system (English PDF)
This is a limited preview
Buy now to download the full PDF (9 pages)
Need quotation for your management?
Get a formal quotation for DL/T 324-2024 in 30 minutes.
Issued by
National Energy Administration
Level / Type
National · Recommended
Issue date
December 25, 2024
Implementation date
June 25, 2025
Scope
DL/T 324-2024 (Communication protocol for dam safety monitoring automation system) is available as an English-translated PDF.
DL/T 324-2024 — Communication protocol for dam safety monitoring automation system
Found what you need?
Document preview — DL/T 324-2024
National Standard of the People's Republic of China
- ICS
- 27.140
- Classification
- P 55
- Replacing
- DL/T 324-2010
Issued by: National Energy Administration
Contents
- Document data1
Document data
International classification (ICS): 27.140.
Chinese classification (CCS): P55.
Estimated length of the Chinese original: 14,148 words.
Supersedes the earlier edition DL/T 324-2010.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 9 pages — is available in the English PDF.
How to Download DL/T 324-2024
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
DL/T 1210-2025 — Code for Testing and Acceptance of Automatic Generation Control Performance of Thermal Power Plant
DL/T 1332-2025 — Guidelines for on-site low-frequency test of excitation characteristic of the current transformer
DL/T 2875.1-2025 — Technical specification for dust suppression of coal transportation equipment in thermal power plants - Part 1: General provisions
Secure payment via Stripe
Payments accepted
DL/T 324-2024
$304.00