Valid

DL/T 2897-2025Technical guidelines for phased array ultrasonic testing of blade root of gas turbine compressor motor (English PDF)

燃气轮机压气机动叶片叶根相控阵超声检测技术导则

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for DL/T 2897-2025 in 30 minutes.

Issued by

National Energy Administration

Level / Type

National · Recommended

Issue date

January 1, 2025

Implementation date

January 1, 2025

Scope

DL/T 2897-2025 is the English-translated version of 燃气轮机压气机动叶片叶根相控阵超声检测技术导则.

DL/T 2897-2025 is the Chinese standard "Technical guidelines for phased array ultrasonic testing of blade root of gas turbine compressor motor".

Found what you need?

Document preview — DL/T 2897-2025

Contents

  • [Preview only]
  • 1 Scope
  • 1.2 Normative references
  • 3 Terms and definitions
  • 3.1 General requirements
  • 3.2 Rock
  • 3.3 Cement and mineral admixtures
  • 3.4 Aggregate of high-performance self-compacting concrete
  • 3.5 Chemical admixtures
  • 4 Interface flange 5052 H112 GB/T 3880
  • 4.1 General
  • 4.2 Rated voltage (Ur)
  • 4.3 Rated insulation level
  • 4.4 Rated frequency (fr)
  • 4.5 Rated normal current (Ir) and temperature rise
  • 4.6 Rated short-time withstand current (Ik)
  • 4.7 Rated peak withstand current (Ip)
  • 4.8 Rated duration of short circuit (tk)
  • 5 Fixed tray 5754 H112 GB/T 3191
  • 5.1 Designation of materials used for main parts and components
  • 5.2 Seal ring material requirements
  • 5.3 Earthing of circuit-breakers
  • 5.4 Auxiliary and control equipment
  • 5.5 Power operation
  • 5.6 Stored energy operation
  • 5.7 Independent manual operation
  • 5.8 Operation of releases
  • 5.9 Low- and high-pressure interlocking devices
  • 6 Cooling tube 1050A GB/T 6893
  • 6.1 Requirements for arrangement of tube bundle cooling element
  • 6.2 Design pressure of tube bundle
  • 6.3 Design of tube bundle structure
  • 6.4 Measurement of the resistance of the main circuit
  • 6.5 Temperature-rise tests
  • 6.6 Short-time withstand current and peak withstand current tests
  • 6.7 Verification of the degree of protection
  • 6.8 Tightness tests
  • 6.9 Electromagnetic compatibility (EMC) tests
  • 7 Tube plate and connecting plate 5A05 and 6063 T6 GB/T 6892
  • 7.2 Dielectric test on the main circuit
  • 7.3 Tests on auxiliary and control circuits
  • 7.6 Design and visual checks
  • 7.7 Mechanical operating and mechanical characteristic tests
  • 7.8 Gas humidity measurement
  • 8 Inspection and acceptance
  • 9 Marking, packaging, storage and transport

1 Foreword

DL/T 2897-2025 was issued by National Energy Administration on 30 June 2025 and has been in force since 30 December 2025.

The DL/T prefix marks a recommended standard. It is not law in itself: it becomes binding when a contract names it, when a regulation or a mandatory standard refers to it, or when a producer declares conformity with it.

The document runs to 15 pages in English translation.

2 Scope Preview

DL/T 2897-2025 carries no ICS number and no Chinese Standard Classification code.

This catalogue holds 4,757 other DL/T standards.

Of the 2,309 DL/T standards that do carry an ICS number, 1,146 (50%) fall under ICS 27, in the field of energy and heat transfer engineering.

3 About this standard

Sector: Electricity & Power

Issued by: National Energy Administration

English translation: about 15 pages (approximate)

4 Classification and status

Prefix DL/T: recommended standard.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

How to Download DL/T 2897-2025

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Fast delivery

    After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Fast delivery
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

DL/T 2897-2025

$195.00