Valid

DL/T 1851-2018Pipes and fittings of steel lined with rubber for power plants (English PDF)

Preview PDF

This is a limited preview

Buy now to download the full PDF (11 pages)

Need quotation for your management?

Get a formal quotation for DL/T 1851-2018 in 30 minutes.

Issued by

National Energy Administration

Level / Type

National · Recommended

Issue date

April 3, 2018

Implementation date

July 1, 2018

Scope

DL/T 1851-2018 (Pipes and fittings of steel lined with rubber for power plants) is available as an English-translated PDF.

DL/T 1851-2018 — This standard specifies the structural design, technical requirements, inspection, inspection rules, marking, storage and installation of steel-lined rubber pipes and fittings.

Found what you need?

Document preview — DL/T 1851-2018

National Standard of the People's Republic of China

ICS
27.100
Classification
F 20

Issued by: National Energy Administration

Contents

  • What this standard covers1
  • Document data2
  • Standards quoted by this document3

What this standard covers

This standard specifies the structural design, technical requirements, inspection, inspection rules, marking, storage and installation of steel-lined rubber pipes and fittings. This standard applies to anti-corrosion pipes and fittings of power plant water treatment, wastewater treatment, cooling water and desulfurization systems.

Document data

International classification (ICS): 27.100.

Chinese classification (CCS): F20.

Estimated length of the Chinese original: 17,149 words.

Standards quoted by this document

GB/T 3091; GB/T 7760; GB/T 8163; GB/T 8923.1; GB/T 9114; GB/T 9119; GB/T 9121.1; GB/T 9123.1; GB/T 11211; GB/T 12459; GB/T 18241.1; GBZ/T 195; DL/T 695; DL/T 935

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 11 pages — is available in the English PDF.

How to Download DL/T 1851-2018

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
11 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

DL/T 1851-2018

$384.00