Valid

DL/T 1502-2016Guide of calculating settings of relay protections for auxiliary system of power plant (English PDF)

厂用电继电保护整定计算导则

Preview PDF

This is a limited preview

Buy now to download the full PDF (34 pages)

Need quotation for your management?

Get a formal quotation for DL/T 1502-2016 in 30 minutes.

Issued by

National Energy Administration

Level / Type

National · Recommended

Issue date

January 7, 2016

Implementation date

June 1, 2016

Scope

DL/T 1502-2016 is the English-translated version of 厂用电继电保护整定计算导则.

DL/T 1502-2016 — This standard prescribes the principles and methods of setting calculation of relay protection for auxiliary power system, which is the basis for setting calculation of design, research, operation, commissioning and manufacturing department.

This standard includes high-voltage auxiliary transformer protection, low-voltage auxiliary transformer protection, high-voltage auxiliary power supply protection, high-voltage auxiliary power supply protection, low-voltage auxiliary power supply system protection (0.4kV part) and standby power supply switching device Tuning calculation.

This standard is applicable to setting calculation of relay protection of auxiliary power system of firepower and hydroelectric power plants.

Found what you need?

Document preview — DL/T 1502-2016

National Standard of the People's Republic of China

ICS
29.240
Classification
K 45

Issued by: National Energy Administration

Contents

  • What this standard covers1
  • Document data2
  • Standards quoted by this document3

What this standard covers

This standard prescribes the principles and methods of setting calculation of relay protection for auxiliary power system, which is the basis for setting calculation of design, research, operation, commissioning and manufacturing department. This standard includes high-voltage auxiliary transformer protection, low-voltage auxiliary transformer protection, high-voltage auxiliary power supply protection, high-voltage auxiliary power supply protection, low-voltage auxiliary power supply system protection (0.4kV part) and standby power supply switching device Tuning calculation. This standard is applicable to setting calculation of relay protection of auxiliary power system of firepower and hydroelectric power plants. Other types of auxiliary power system protection setting calculation can be referred to.

Document data

International classification (ICS): 29.240.

Chinese classification (CCS): K45.

Estimated length of the Chinese original: 51,512 words.

Standards quoted by this document

GB 1208-2006; GB/T 14285-2006; GB/T 14598.151-2012; GB/T 14598.15-1998

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 34 pages — is available in the English PDF.

How to Download DL/T 1502-2016

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
34 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

DL/T 1502-2016

$560.00