Valid

DL/T 1432.2-2016Testing specification for on-line monitoring device of transformation equipment - Part 2: On-line monitoring device of gases dissolved in transformer oil (English PDF)

Preview PDF

Also coversDLT1432.2-2016

This is a limited preview

Buy now to download the full PDF (12 pages)

Need quotation for your management?

Get a formal quotation for DL/T 1432.2-2016 in 30 minutes.

Issued by

National Energy Administration

Level / Type

National · Recommended

Issue date

January 7, 2016

Implementation date

June 1, 2016

Scope

DL/T 1432.2-2016 (Testing specification for on-line monitoring device of transformation equipment - Part 2: On-line monitoring device of gases dissolved in transformer oil) is available as an English-translated PDF.

DL/T 1432.2-2016 — This Part specifies the test conditions, test items, instruments and materials, test contents and requirements, test result processing and test cycle for the on- line monitoring device of gases dissolved in transformer oil.

This Part is applicable to the testing of special test items for the on-line monitoring device of gases dissolved in transformer oil.

Found what you need?

Document preview — DL/T 1432.2-2016

National Standard of the People's Republic of China

ICS
29.040.10
Classification
E 38

Issued by: National Energy Administration

Contents

  • Foreword...3
  • 1 Scope...4
  • 2 Normative references...4
  • 3 Test conditions...5
  • 4 Test items...5
  • 5 Instruments and materials...6
  • 6 Test contents and requirements...7
  • 7 Test result processing and test cycle...11
  • Annex A (Informative) Records of the measurement error test results...12

Foreword

DL/T 1432 Testing specification for on-line monitoring device of transformation

equipment is divided into 5 parts.

— Part 1. General testing specification;

— Part 2. On-line monitoring device of gases dissolved in transformer oil;

— Part 3. On-line insulation monitoring device of capacitive equipment and

metal-oxide surge arrester;

— Part 4. On-line partial discharge monitoring device (UHF) of gas insulated

switchgear;

— Part 5. On-line monitoring device of the earthing current of power

transformer core.

This Part is Part 2.

This Part was proposed by the China Electricity Council.

This Part shall be under the jurisdiction of the National Technical Committee for

Standardization of Condition-based Maintenance and On-line Monitoring of

Electrical Power Units.

Major drafting organization of this Part. China Electric Power Research Institute.

Major participating organizations of this Part. State Grid Zhejiang Electric Power

Company, State Grid Hebei Electric Power Company, Electric Power Research

Institute of Guangdong Power Grid Corporation, Ningbo Ligong Online

Monitoring Technology Co., Ltd, Henan Zhongfen Instrument Co., Ltd, and

Sieyuan Electric Co., Ltd.

Main drafters of this Part. Yuan Shuai, Yan Chunyu, Gao Keli, Bi Jiangang, Shi

Yanjie, Liu Ming, Wang Feng, Peng Jiang, Wu Liyuan, Yang Yuan, Gong

Yanpeng, Yang Ning, Chang Wenzhi, Jiao Fei, Qi Jiong, Zhang Liyan, Fu Qiang,

Zhao Yong, Zhang Hongbo, Li Gang, Meng Nan, Deng Yanguo and Zhang Wei.

Any comments or suggestions about this Standard in the implementation

process shall be fed back to the Standardized Management Center of the China

Electricity Council (No. 1, Lane 2, Baiguang Road, Beijing, 100761).

Testing specification for on-line monitoring

device of transformation equipment -

Part 2. On-line monitoring device of gases

dissolved in transformer oil

1 Scope

This Part specifies the test conditions, test items, instruments and materials,

test contents and requirements, test result processing and test cycle for the on-

line monitoring device of gases dissolved in transformer oil.

This Part is applicable to the testing of special test items for the on-line

monitoring device of gases dissolved in transformer oil.

2 Normative references

The following documents are essential to the application of this document. For

dated references, only the editions with the dates indicated are applicable to

this document. For undated references, only the latest editions (including all the

amendments) are applicable to this document.

GB 2536 Fluids for electrotechnical applications - Unused mineral insulating

oils for transformers and switchgear

GB/T 7597 Method of sampling for transformer and turbine oils in electric

power industry

GB/T 17623-1998 Determination of component contents of gases dissolved

in insulating oil by gas chromatography method

DL/T 722 Guide to the analysis and the diagnosis of gases dissolved in

transformer oil

DL/T 1432.1-2015 Testing specification for on-line monitoring device of

transformation equipment - Part 1. General testing specification

DL/T 1498.2-2016 Technical specification for on-line monitoring device of

transformation equipment - Part 2. On-line monitoring device of gases

dissolved in transformer oil

3 Test conditions

The test conditions are as follows.

a) ambient temperature. 15°C ~ 35°C;

b) relative humidity. 25% ~ 75%;

c) atmospheric pressure. 86kPa ~ 106kPa; and

d) the supply voltage and power shall conform to the requirements given in

the manual for the on-line monitoring device of gases dissolved in

transformer oil.

Note. When the equipment cannot be tested under the above conditions for some reason, the actual

weather conditions shall be recorded in the test report.

4 Test items

The tests for the on-line monitoring device of gases dissolved in transformer oil

are divided into type test, exit-factory test, commissioning test and field test.

The test requirements for general items are in accordance with DL/T 1432.1-

2015 Testing specification for on-line monitoring device of transformation

equipment - Part 1. General testing specification. The special items shall be

implemented in accordance with this Standard. The specific test items are

shown in Table 1.

Table 1 -- Test Items for the On-line Monitoring Device of Gases

Dissolved in Transformer Oil

S/N Test item Standard Clause Type test

Exit-

factory

test

Commissioning

test

Field

test

1 Structure and appearance inspection

DL/T 1432.1-

2015 4.2 - - - -

2 Basic function testing DL/T 1432.1-2015 4.3 - - - -

3 Insulation resistance test DL/T 1432.1-2015 4.6.1 - - - *

4 Dielectric strength test DL/T 1432.1-2015 4.6.2 - - * *

5 Impulse voltage test DL/T 1432.1-2015 4.6.3 - - * o

6 Electromagnetic compatibility test

DL/T 1432.1-

2015 4.7 - o o o

7 Cold test DL/T 1432.1-2015 4.5.2 - o o o

5.3 Standard gas mixture for calibration

The standard gas mixture, accompanied with the content of components,

inspection certificate and effective life, shall be prepared by the organization(s)

authorized by the national metrology department, which is mainly used for the

calibration of laboratory gas chromatograph.

5.4 Gases for the preparation of oil samples

The gases for the preparation of oil samples shall be single-component gas and

multi-component gas mixture containing the following components. hydrogen

(H2), methane (CH4), ethane (C2H6), ethylene (C2H4), acetylene (C2H2), carbon

monoxide (CO) and carbon dioxide (CO2).

5.5 Other gases

Other gases used in the testing shall conform to the following requirements.

a) Nitrogen (or argon). The purity shall not be less than 99.99%.

b) Hydrogen. The purity shall not be less than 99.99%.

c) Air. Pure and oil-free.

5.6 Oil sample preparation device

The device shall have the functions of temperature control, stirring, etc., and

shall be equipped with the gas inlet, oil sampling port, interface of the on-line

monitoring device, etc.

5.7 Tubes for the gas and oil circuit systems

Stainless steel tubes, copper tubes or oil-resistant polymer tubes with a wall

thickness of not less than 1mm shall be used as the sampling tubes.

5.8 Thermometer, barometer

The thermometer and barometer for testing shall conform to the following

requirements.

a) The measuring range of the thermometer shall be -20°C to 50°C, and the

measurement accuracy shall not be greater than 0.1°C.

b) The measuring range of the barometer shall be 80kPa to 110kPa, and the

measurement accuracy shall not be greater than 0.2kPa.

6 Test contents and requirements

6.1 Measurement error test

6.3.2 Qualification criteria. The minimum test cycle of the device shall not

exceed the time specified in Tables 3 and 4 of DL/T 1498.2-2016 Technical

specification for on-line monitoring device of transformation equipment - Part 2.

On-line monitoring device of gases dissolved in transformer oil.

6.4 Data transmission test

When communication connection is established between the on-line monitoring

device and the computer, it shall be able to realize real-time data export.

6.5 Check for data analysis function

a) The multi-component monitoring device shall provide component content,

so as to be able to calculate the absolute gas production rate and relative

gas production rate. In addition, there are a variety of display methods, such

as reports, tendency charts, single-component display, simultaneous multi-

component display, etc. The device also has the functions of alarm and fault

diagnosis.

b) The low-component monitoring device shall at least be able to monitor the

component contents of hydrogen (H2), acetylene (C2H2) and other critical

gases, along with the function of fault diagnosis.

c) Qualification criteria. The on-line monitoring device shall be possessed of

the above functions in normal operating condition.

7 Test result processing and test cycle

7.1 Test result processing

If conforming to the requirements of the above standards, the test conclusion

of "qualified" will be given for the on-line monitoring device of gases dissolved

in transformer oil, otherwise the test conclusion of "unqualified" will be given

instead. For each qualified on-line monitoring device of gases diss...

......

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 12 pages — is available in the English PDF.

Referenced standards

How to Download DL/T 1432.2-2016

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
12 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

DL/T 1432.2-2016

$75.00