DL/T 1212-2013Guide for technical of fieldbus device installation in fossil fuel power plants (English PDF)

火力发电厂现场总线设备安装技术导则

Preview PDF

DL/T 1212 | Evolution and historical versions

Std IDTitleStatus
DL/T 1212-2025Technical guidelines for the setup of fieldbus equipment in the thermal power plantValid
DL/T 1212-2013Guide for technical of fieldbus device installation in fossil fuel power plantsObsolete

DL/T 1212-2013 is obsolete. It has been replaced by DL/T 1212-2025. This page sells the obsolete edition, for projects and contracts that still cite it.

This is a limited preview

Buy now to download the full PDF

Need quotation for your management?

Get a formal quotation for DL/T 1212-2013 in 30 minutes.

Issued by

National Energy Administration

Level / Type

National · Recommended

Issue date

March 7, 2013

Implementation date

August 1, 2013

Scope

DL/T 1212-2013 is the English-translated version of 火力发电厂现场总线设备安装技术导则.

DL/T 1212-2013 is the Chinese industry standard "Guide for technical of fieldbus device installation in fossil fuel power plants". It was issued on March 7, 2013 by the National Energy Administration, and took effect on August 1, 2013. It is obsolete: it has been replaced by DL/T 1212-2025.

Found what you need?

Document preview — DL/T 1212-2013

National Standard of the People's Republic of China

Issued by: National Energy Administration

Contents

  • Document data
1 Document data

Sector: Electricity & Power (industry standard).

Issuing body: National Energy Administration.

Date of issue: 2013-03-07.

Date of implementation: 2013-08-01.

Status: obsolete, replaced by DL/T 1212-2025.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.

How to Download DL/T 1212-2013

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

DL/T 1212-2013

$255.00