DL/T 1130-2009System Test Standard for HVDC Project (English PDF)
高压直流输电工程系统试验规程
This is a limited preview
Buy now to download the full PDF (17 pages)
Need quotation for your management?
Get a formal quotation for DL/T 1130-2009 in 30 minutes.
Issued by
National Energy Administration
Level / Type
National · Recommended
Issue date
July 22, 2009
Implementation date
December 1, 2009
Scope
DL/T 1130-2009 is the English-translated version of 高压直流输电工程系统试验规程.
DL/T 1130-2009 — This standard specifies test HVDC project engineering systems, requirements and acceptance criteria. This standard applies to bidirectional transmission power can be a 12-pulse valve per pole bipolar HVDC transmission project, back to back HVDC project can reference.
For some HVDC project required special function/performance, you should treat the engineering and technical specifications, a corresponding increase in pilot projects.
Project scope of the final system test project to start a pilot program approved by the Commission shall prevail.
Found what you need?
Document preview — DL/T 1130-2009
National Standard of the People's Republic of China
- ICS
- 27.100
- Classification
- F 24
Issued by: National Energy Administration
Contents
- What this standard covers1
- Document data2
- Standards quoted by this document3
What this standard covers
This standard specifies test HVDC project engineering systems, requirements and acceptance criteria. This standard applies to bidirectional transmission power can be a 12-pulse valve per pole bipolar HVDC transmission project, back to back HVDC project can reference. For some HVDC project required special function/performance, you should treat the engineering and technical specifications, a corresponding increase in pilot projects. Project scope of the final system test project to start a pilot program approved by the Commission shall prevail. This standard should be the corresponding part of the converter station equipment and subsystem tests performed after completion of the test.
Document data
International classification (ICS): 27.100.
Chinese classification (CCS): F24.
Estimated length of the Chinese original: 26,249 words.
Standards quoted by this document
DL/T 968-2005
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 17 pages — is available in the English PDF.
Referenced standards
How to Download DL/T 1130-2009
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
DL/T 1010.3-2025 — High voltage static reactive power compensation devices - Part 3: Control and protection system
DL/T 1078-2025 — Test specification for operating performance of surface condenser
DL/T 1081-2025 — Operating code for 12kV~40.5kV outdoor high voltage switchgear
Secure payment via Stripe
Payments accepted
DL/T 1130-2009
$315.00