DL/T 1041-2007Guide for performing the field tests of electromagnetic transients on electric power systems (English PDF)
电力系统电磁暂态现场试验导则
This is a limited preview
Buy now to download the full PDF (15 pages)
Need quotation for your management?
Get a formal quotation for DL/T 1041-2007 in 30 minutes.
Issued by
National Development and Reform Commission
Level / Type
National · Recommended
Issue date
July 20, 2007
Implementation date
December 1, 2007
Scope
DL/T 1041-2007 is the English-translated version of 电力系统电磁暂态现场试验导则.
DL/T 1041-2007 — This standard specifies the organization of power system equipment (including the line) operation electromagnetic transient field test methods and procedures, preparation of test solutions, the test conditions for the development of technology, the measurement system wiring and measurement equipment and components for use, safety precautions matters, technical details and test reports test preparation requirements.
On-site testing on the ground and prevent electromagnetic interference and other issues were highlighted described.
This standard applies to the substations, power plants, with AC high voltage switching devices (including circuit breakers, isolating switches, load switches, reclosers, etc.) cast, cut power equipment and power lines, as well as in artificial electromagnetic temporary failure test state during field trials.
Found what you need?
Document preview — DL/T 1041-2007
National Standard of the People's Republic of China
- ICS
- 17.220.20
- Classification
- A 55
Issued by: National Development and Reform Commission
Contents
- What this standard covers1
- Document data2
- Standards quoted by this document3
What this standard covers
This standard specifies the organization of power system equipment (including the line) operation electromagnetic transient field test methods and procedures, preparation of test solutions, the test conditions for the development of technology, the measurement system wiring and measurement equipment and components for use, safety precautions matters, technical details and test reports test preparation requirements. On-site testing on the ground and prevent electromagnetic interference and other issues were highlighted described. This standard applies to the substations, power plants, with AC high voltage switching devices (including circuit breakers, isolating switches, load switches, reclosers, etc.) cast, cut power equipment and power lines, as well as in artificial electromagnetic temporary failure test state during field trials. Does not apply to lightning and DC transmission system electromagnetic transient test, but part of the contents of this standard test for HVDC reference.
Document data
International classification (ICS): 17.220.20.
Chinese classification (CCS): A55.
Estimated length of the Chinese original: 23,272 words.
Standards quoted by this document
NDRC Notice No. 42 of 2007
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
How to Download DL/T 1041-2007
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
DL/T 1010.3-2025 — High voltage static reactive power compensation devices - Part 3: Control and protection system
DL/T 1078-2025 — Test specification for operating performance of surface condenser
DL/T 1081-2025 — Operating code for 12kV~40.5kV outdoor high voltage switchgear
Secure payment via Stripe
Payments accepted
DL/T 1041-2007
$285.00