DL/T 1033.1-2006Electric power standard thesaurus. Part 1: Power engineering (English PDF)
电力行业词汇 第1部分:动力工程
DL/T 1033.1 | Evolution and historical versions
| Std ID | Title | Status |
|---|---|---|
| DL/T 1033.1-2016 | Electric Power Standard Thesaurus—Part1: Power Engineering | Valid |
| DL/T 1033.1-2006 | Electric power standard thesaurus. Part 1: Power engineering | Obsolete |
DL/T 1033.1-2006 is obsolete. It has been replaced by DL/T 1033.1-2016. This page sells the obsolete edition, for projects and contracts that still cite it.
This is a limited preview
Buy now to download the full PDF
Need quotation for your management?
Get a formal quotation for DL/T 1033.1-2006 in 30 minutes.
Issued by
National Development and Reform Commission
Level / Type
National · Recommended
Issue date
December 17, 2006
Implementation date
May 1, 2007
Scope
DL/T 1033.1-2006 is the English-translated version of 电力行业词汇 第1部分:动力工程.
DL/T 1033.1-2006 is the Chinese industry standard "Electric power standard thesaurus. Part 1: Power engineering". It was issued on December 17, 2006 by the National Development and Reform Commission, and took effect on May 1, 2007. It is obsolete: it has been replaced by DL/T 1033.1-2016.
Found what you need?
Document preview — DL/T 1033.1-2006
National Standard of the People's Republic of China
Issued by: National Development and Reform Commission
Contents
- Document data
1 Document data
Sector: Electricity & Power (industry standard).
Issuing body: National Development and Reform Commission.
Date of issue: 2006-12-17.
Date of implementation: 2007-05-01.
Status: obsolete, replaced by DL/T 1033.1-2016.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.
How to Download DL/T 1033.1-2006
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
DL/T 1033.2-2006 — Electric power standard thesaurus. Part 2: Electric power system
DL/T 1033.3-2014 — Electric power standard thesaurus. Part 3: Power plant, hydroelectric power generation
DL/T 1033.3-2006 — Electric power standard thesaurus Part 3: Power plant, Hydroelectric power generation
DL/T 1033.1-2006
$530.00