CJJ 217-2014Technical code for operation in excavation chamber of shield tunneling machine at atmospheric or compressed air (English PDF)
盾构法开仓及气压作业技术规范
This is a limited preview
Buy now to download the full PDF (24 pages)
Need quotation for your management?
Get a formal quotation for CJJ 217-2014 in 30 minutes.
Issued by
Ministry of Housing and Urban-Rural Development of the People's Republic of China
Level / Type
National · Mandatory
Issue date
June 12, 2014
Implementation date
December 1, 2014
Scope
CJJ 217-2014 is the English-translated version of 盾构法开仓及气压作业技术规范.
CJJ 217-2014 — This standard applies to the use of shield loose method in the construction of atmospheric pressure and pressure operating environment under the open operation.
Found what you need?
Document preview — CJJ 217-2014
National Standard of the People's Republic of China
Issued by: Ministry of Housing and Urban-Rural Development of the People's Republic of China
Contents
- [Preview only]
- 1 General provisions
- 2 Terms and symbols
- 2.1 Terms
- 2.2 Symbols
- 2.3 Service for operation and maintenance
- 2.4 Economic and environmental protection operation indexes
- 2.5 Spare parts
- 3 Basic Requirements
- 3.1 General requirements
- 3.2 Quality requirements
- 3.3 Design calculation parameters
- 3.4 Transportation and storage
- 3.5 Seismic Conceptual Design
- 3.6 Fault handling
- 3.7 Maintenance and overhaul
- 4 Design
- 4.2 Pipeline layout and laying
- 4.3 Pipeline hydraulic calculation
- 4.4 Pipeline structural design
- 4.5 Pipeline appurtenances and buttresses
- 4.6 Serviceability Limit State Calculation
- 4.7 Pipe Connection
- 4.8 Subgrade Treatment
- 4.9 Backfill Design
- 5 Construction
- 5.2 Trench excavation and soil treatment
- 5.3 Pipeline connection
- 5.4 Pipeline laying
- 5.5 Trench backfill
- 5.6 Pipeline appurtenances and auxiliaries installation
- 5.7 Connection of branch pipe/service pipe to existing pipeline
- 6 Water pressure test, flushing and disinfection
- 6.2 Water pressure test
- 6.3 Flushing and disinfection
- 6.4 Time History Analysis Method
- 6.5 Seismic Analysis for Regular Bridges
- 6.6 Calculation for Capacity Protected Member
- 6.7 Bridge Abutment
- 7 Construction completion and final acceptance
- 7.2 Seismic Check for E1 Earthquake
- 7.3 Seismic Check for E2 Earthquake
- 7.4 Seismic Check for Capacity Protected Members
- 7.5 Structural calculation of inspection well
- 7.6 Dispatching
- 8 Grade Separation Junction, Viaduct and Underpass
- 8.2 Grade Separation Junction and Viaduct
- 8.3 Underpass
- 8.4 Structural calculation of tunnel
- 9 Bridge Detail Structures and Attachments
- 9.2 Drainage and Waterproofing Design of Bridge Deck and Underpass
- 9.3 Bridge Expansion Joints
- 9.4 Bridge Bearing
- 9.5 Bridge Railing
- 9.6 Lighting, Energy Saving and Environmental Protection
- 9.7 Other Attachments
1 Foreword
CJJ 217-2014 was issued by Ministry of Housing and Urban-Rural Development of the People's Republic of China on 12 June 2014 and has been in force since 1 December 2014.
The CJJ prefix, without a suffix, marks a mandatory standard: within its scope, compliance is required.
The document runs to 24 pages in English translation.
2 Scope Preview
This standard applies to the use of shield loose method in the construction of atmospheric pressure and pressure operating environment under the open operation.
CJJ 217-2014 carries no ICS number and no Chinese Standard Classification code.
This catalogue holds 122 other CJJ standards.
Of the 57 CJJ standards that do carry an ICS number, 30 (53%) fall under ICS 91, in the field of construction materials and building.
3 About this standard
Issued by: Ministry of Housing and Urban-Rural Development of the People's Republic of China
English translation: about 24 pages
Chinese original: about 36,379 characters
4 Classification and status
Prefix CJJ: mandatory standard.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 24 pages — is available in the English PDF.
How to Download CJJ 217-2014
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
CJJ 274-2018 — Technical standard for deodorization of environmental sanitation facilities
CJJ 63-2018 — Polyethylene gas pipeline engineering technical standards
CJJ 122-2017 — Technical specification for water supply and drainage engineering of swimming pool
CJJ 217-2014
$600.00