CJJ 159-2011Technical specification for leak detection of water supply pipe nets in cities and towns (English PDF)
城镇供水管网漏水探测技术规程
This is a limited preview
Buy now to download the full PDF (40 pages)
Need quotation for your management?
Get a formal quotation for CJJ 159-2011 in 30 minutes.
Issued by
Ministry of Housing and Urban-Rural Development of the People's Republic of China
Level / Type
National · Mandatory
Issue date
January 7, 2011
Implementation date
October 1, 2011
Scope
CJJ 159-2011 is the English-translated version of 城镇供水管网漏水探测技术规程.
CJJ 159-2011 — This standard applies to urban water supply pipe network leak detection.
Found what you need?
Document preview — CJJ 159-2011
National Standard of the People's Republic of China
- ICS
- 91.140.60
- Classification
- P 41
Issued by: Ministry of Housing and Urban-Rural Development of the People's Republic of China
Contents
- [Preview only]
- 1 General provisions
- 2 Terms and symbols
- 2.1 Terms
- 2.2 Symbols
- 2.3 Service for operation and maintenance
- 2.4 Economic and environmental protection operation indexes
- 2.5 Spare parts
- 3 Materials
- 3.1 General requirements
- 3.2 Quality requirements
- 3.3 Design calculation parameters
- 3.4 Transportation and storage
- 3.5 Stop operating
- 3.6 Fault handling
- 3.7 Maintenance and overhaul
- 4 Design
- 4.2 Pipeline layout and laying
- 4.3 Pipeline hydraulic calculation
- 4.4 Pipeline structural design
- 4.5 Pipeline appurtenances and buttresses
- 4.6 Serviceability Limit State Calculation
- 4.7 Pipe Connection
- 4.8 Subgrade Treatment
- 4.9 Backfill Design
- 5 Construction
- 5.2 Trench excavation and soil treatment
- 5.3 Pipeline connection
- 5.4 Pipeline laying
- 5.5 Trench backfill
- 5.6 Pipeline appurtenances and auxiliaries installation
- 5.7 Connection of branch pipe/service pipe to existing pipeline
- 6 Water pressure test, flushing and disinfection
- 6.2 Water pressure test
- 6.3 Flushing and disinfection
- 6.4 Operation and regulation
- 7 Construction completion and final acceptance
- 7.2 Parameter detection
- 7.3 Parameter regulation and control
- 7.4 Computer automatic monitoring
- 7.5 Optimum operating condition
- 7.6 Dispatching
1 Foreword
CJJ 159-2011 was issued by Ministry of Housing and Urban-Rural Development of the People's Republic of China on 7 January 2011 and has been in force since 1 October 2011.
The CJJ prefix, without a suffix, marks a mandatory standard: within its scope, compliance is required.
The document runs to 40 pages in English translation.
2 Scope Preview
This standard applies to urban water supply pipe network leak detection.
CJJ 159-2011 falls under ICS 91.140.60, in the field of construction materials and building.
This catalogue holds 29 other CJJ standards in that field.
In this catalogue, CJJ standards carry edition years from 1985 to 2018.
3 About this standard
Issued by: Ministry of Housing and Urban-Rural Development of the People's Republic of China
English translation: about 40 pages
Chinese original: about 60,618 characters
4 Related standards
Standards on related subjects:
GB/T 18916.3-2022 — Norm of water intake—Part 3: Petroleum refining
GB/T 18916.31-2017 — Norm of water intake - Part 31 :Sintering and pelletizing for iron and steel industry
CJ/T 217-2013 — Compound quick air inbreathe-release valve for water supply pipeline
CJ/T 169-2018 — Microfiltration water treatment equipment
CJ/T 167-2016 — Multi-function control valve for pumping system
5 Classification and status
International classification (ICS): 91.140.60
Chinese Standard Classification (CCS): P 41
Prefix CJJ: mandatory standard.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 40 pages — is available in the English PDF.
How to Download CJJ 159-2011
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
CJJ 274-2018 — Technical standard for deodorization of environmental sanitation facilities
CJJ 63-2018 — Polyethylene gas pipeline engineering technical standards
CJJ 122-2017 — Technical specification for water supply and drainage engineering of swimming pool
CJJ 159-2011
$285.00