CECS 385-2014Technical specification for durability control of recycled aggregate concrete (English PDF)
再生骨料混凝土耐久性控制技术规程
This is a limited preview
Buy now to download the full PDF (27 pages)
Need quotation for your management?
Get a formal quotation for CECS 385-2014 in 30 minutes.
Issued by
China Association for Engineering Construction Standardization
Level / Type
National · Mandatory
Issue date
January 1, 2014
Implementation date
February 1, 2015
Scope
CECS 385-2014 is the English-translated version of 再生骨料混凝土耐久性控制技术规程.
CECS 385-2014 is the Chinese standard "Technical specification for durability control of recycled aggregate concrete". It was issued by China Association for Engineering Construction Standardization.
Found what you need?
Document preview — CECS 385-2014
National Standard of the People's Republic of China
- ICS
- 91.100.30
- Classification
- P25
Issued by: China Association for Engineering Construction Standardization
Contents
- [Preview only]
- 1 General Provisions
- 2 Terms and Symbols
- 2.1 Terms
- 2.2 Symbols
- 3 Materials
- 3.1 General Requirements
- 3.2 Determination of Estimated Strength of Concrete with Dilled Cores
- 3.3 Drilled Core Correction Method
- 4 Major Equipments
- 4.2 Tension Cable and Anchor
- 4.3 Load
- 4.4 Detailing requirements
- 4.5 Artificial Filling Foundation Treatment by Heavy Tamping
- 5 Structural Calculation
- 5.2 Analysis of Initial State of Form
- 5.3 Analysis of Effects under Loads
- 5.4 Analysis of Pattern Cutting
- 5.5 Construction Quality Control and Monitor
- 5.6 Environmental Protection
- 6 Processing of Core or Technical Requirements of Specimen
- 6.2 Connection between Membrane Materials
- 6.3 Connection between Membrane and Rigid Boundary
- 6.4 Connection between Membrane and Flexible Boundary
- 6.5 Painting
- 7 Test of Core Specimen and Calculation of Compressive Strength
- 7.2 Inspection items
- 7.3 Qualification judgment
- 7.4 Maintenance
- 8 Erection
- 8.1 Erection of Steel Members and Tension Cables
- 8.2 Erection of Membrane Elements
- 8.3 Application of Pretension Force
- 8.4 Nondestructive Testing of Connection of Structural Steel Casting
- 8.5 Marking, Storage and Transport
- 9 Acceptance
1 Foreword
CECS 385-2014 was issued by China Association for Engineering Construction Standardization on 10 December 2014 and has been in force since 1 February 2015.
The CECS prefix marks a association standard of the engineering construction sector, adopted voluntarily.
The document runs to 27 pages in English translation.
2 Scope Preview
CECS 385-2014 falls under ICS 91.100.30, in the field of construction materials and building.
This catalogue holds 144 other CECS standards in that field.
In this catalogue, CECS standards carry edition years from 1988 to 2016.
3 About this standard
Sector: Construction Industry Standard
Issued by: China Association for Engineering Construction Standardization
English translation: about 27 pages (approximate)
Chinese original: about 40,423 characters
4 Related standards
Standards on related subjects:
JG/T 163-2013 — Couplers for Rebar Mechanical Splicing
CECS 444-2016 — Technical specification for precast concrete structures with rebars mechanical splicing
CECS 242-2016 — Technical specification for strengthening concrete structures with grid rebar and mortar
CECS 436-2016 — Technical code for chained wall of concrete precast piles
5 Classification and status
International classification (ICS): 91.100.30
Chinese Standard Classification (CCS): P 25
Prefix CECS: association standard of the engineering construction sector, adopted voluntarily.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 27 pages — is available in the English PDF.
How to Download CECS 385-2014
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
CECS 147-2016 — Technical specification for soil mass with reinforced cement soil pile and anchors
CECS 242-2016 — Technical specification for strengthening concrete structures with grid rebar and mortar
CECS 27-2016 — Technical specification for cement castable refractories construction in winter of industrial furnaces
CECS 385-2014
$804.00