CECS 373-2014Technical specification for application of inserted false-work and synchronous control system (English PDF)
附着式升降脚手架升降及同步控制系统应用技术规程
This is a limited preview
Buy now to download the full PDF (25 pages)
Need quotation for your management?
Get a formal quotation for CECS 373-2014 in 30 minutes.
Issued by
China Association for Engineering Construction Standardization
Level / Type
National · Mandatory
Issue date
May 7, 2014
Implementation date
September 1, 2014
Scope
CECS 373-2014 is the English-translated version of 附着式升降脚手架升降及同步控制系统应用技术规程.
CECS 373-2014 — Technical specification for application of inserted false-work and synchronous control system
Found what you need?
Document preview — CECS 373-2014
National Standard of the People's Republic of China
- Classification
- P 97
Issued by: China Association for Engineering Construction Standardization
Contents
- [Preview only]
- 1 General Provisions
- 2 Terms and Symbols
- 2.1 Terms
- 2.2 Symbols
- 3 Materials
- 3.1 General Requirements
- 3.2 Determination of Estimated Strength of Concrete with Dilled Cores
- 3.3 Drilled Core Correction Method
- 4 Design
- 4.2 Calculation of Earthquake Action and Earthquake Response
- 4.3 Design of Isolation Layer
- 4.4 Design of Structural Elements Above the Isolation Layer
- 4.5 Design of the Structural Elements below Isolation Layer and of the Soil and Foundation
- 5 Structural Calculation
- 5.2 Design of Seismic Isolator
- 5.3 Installation
- 5.4 Construction Requirements
- 5.5 Construction Quality Control and Monitor
- 5.6 Environmental Protection
- 6 Processing of Core or Technical Requirements of Specimen
- 6.3 Connection between Membrane and Rigid Boundary
- 6.4 Connection between Membrane and Flexible Boundary
- 6.5 Action Effect Combination
- 7 Test of Core Specimen and Calculation of Compressive Strength
- 7.1 Construction and Installation
- 7.2 Construction Survey
- 7.3 Project Acceptance
- 7.4 Maintenance of Isolation Layers
- 7.5 Critical Temperature of Steel Frame Beam and Column
- 8 Detailing Requirements
- 8.1 Erection of Steel Members and Tension Cables
- 8.2 Erection of Membrane Elements
- 8.3 Application of Pretension Force
- 8.4 Nondestructive Testing of Connection of Structural Steel Casting
- 8.5 Marking, Storage and Transport
- 9 Acceptance
- 9.1 Protection Measures and Selection Principle
- 9.2 Construction
1 Foreword
CECS 373-2014 was issued by China Association for Engineering Construction Standardization on 7 May 2014 and has been in force since 1 September 2014.
The CECS prefix marks a association standard of the engineering construction sector, adopted voluntarily.
The document runs to 25 pages in English translation.
2 Scope Preview
This standard is applicable to the design, manufacture, use and management of three-phase disc brake asynchronous motor for electric lifting and synchronous control system of construction-attached lift scaffolding and its special low-speed electric chain hoist and three-phase disc brake.
CECS 373-2014 is filed under Chinese Standard Classification P 97, in the field of engineering construction.
This catalogue holds 136 other CECS standards without an ICS number.
In this catalogue, CECS standards carry edition years from 1988 to 2016.
3 About this standard
Issued by: China Association for Engineering Construction Standardization
English translation: about 25 pages
Chinese original: about 37,323 characters
4 Related standards
Standards on related subjects:
JB/T 2985-2016 — Bimetal bushings for construction machinery
JGJ 276-2012 — Technical code for safety of lifting in construction
JB/T 5943-1991 — Construction machinery - General technical specifications for weldments
CECS 413-2015 — Technical specification for safety of lifting material platform
CECS 372-2014 — Technical specification for lime powder dosing system
5 Classification and status
Chinese Standard Classification (CCS): P 97
Prefix CECS: association standard of the engineering construction sector, adopted voluntarily.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 25 pages — is available in the English PDF.
How to Download CECS 373-2014
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
CECS 147-2016 — Technical specification for soil mass with reinforced cement soil pile and anchors
CECS 242-2016 — Technical specification for strengthening concrete structures with grid rebar and mortar
CECS 27-2016 — Technical specification for cement castable refractories construction in winter of industrial furnaces
CECS 373-2014
$730.00