CECS 372-2014Technical specification for lime powder dosing system (English PDF)
石灰粉料投加系统技术规程
This is a limited preview
Buy now to download the full PDF (15 pages)
Need quotation for your management?
Get a formal quotation for CECS 372-2014 in 30 minutes.
Issued by
China Association for Engineering Construction Standardization
Level / Type
National · Mandatory
Issue date
April 29, 2014
Implementation date
September 1, 2014
Scope
CECS 372-2014 is the English-translated version of 石灰粉料投加系统技术规程.
CECS 372-2014 — This standard applies to the design, installation and acceptance of lime powder dosing system for the treatment of lime softening of water, pH adjustment of water or lime disinfection of sludge.
Found what you need?
Document preview — CECS 372-2014
National Standard of the People's Republic of China
- ICS
- 91.220
- Classification
- P 97
Issued by: China Association for Engineering Construction Standardization
Contents
- [Preview only]
- 1 General Provisions
- 2 Terms and Symbols
- 2.1 Terms
- 2.2 Symbols
- 3 Materials
- 3.1 General Requirements
- 3.2 Determination of Estimated Strength of Concrete with Dilled Cores
- 3.3 Drilled Core Correction Method
- 4 Major Equipments
- 4.2 Tension Cable and Anchor
- 4.3 Load
- 4.4 Detailing requirements
- 4.5 Artificial Filling Foundation Treatment by Heavy Tamping
- 5 Structural Calculation
- 5.2 Analysis of Initial State of Form
- 5.3 Analysis of Effects under Loads
- 5.4 Analysis of Pattern Cutting
- 5.5 Construction Quality Control and Monitor
- 5.6 Environmental Protection
- 6 Processing of Core or Technical Requirements of Specimen
- 6.2 Connection between Membrane Materials
- 6.3 Connection between Membrane and Rigid Boundary
- 6.4 Connection between Membrane and Flexible Boundary
- 6.5 Painting
- 7 Test of Core Specimen and Calculation of Compressive Strength
- 7.2 Inspection items
- 7.3 Qualification judgment
- 7.4 Maintenance
- 8 Erection
- 8.1 Erection of Steel Members and Tension Cables
- 8.2 Erection of Membrane Elements
- 8.3 Application of Pretension Force
- 8.4 Nondestructive Testing of Connection of Structural Steel Casting
- 8.5 Marking, Storage and Transport
- 9 Acceptance
1 Foreword
CECS 372-2014 was issued by China Association for Engineering Construction Standardization on 29 April 2014 and has been in force since 1 September 2014.
The CECS prefix marks a association standard of the engineering construction sector, adopted voluntarily.
The document runs to 15 pages in English translation.
2 Scope Preview
This standard applies to the design, installation and acceptance of lime powder dosing system for the treatment of lime softening of water, pH adjustment of water or lime disinfection of sludge.
CECS 372-2014 falls under ICS 91.220, in the field of construction materials and building.
This catalogue holds 144 other CECS standards in that field.
In this catalogue, CECS standards carry edition years from 1988 to 2016.
3 About this standard
Issued by: China Association for Engineering Construction Standardization
English translation: about 15 pages
Chinese original: about 22,216 characters
4 Related standards
Standards on related subjects:
JB/T 2985-2016 — Bimetal bushings for construction machinery
JGJ 276-2012 — Technical code for safety of lifting in construction
JB/T 5943-1991 — Construction machinery - General technical specifications for weldments
CECS 413-2015 — Technical specification for safety of lifting material platform
CECS 373-2014 — Technical specification for application of inserted false-work and synchronous control system
5 Classification and status
International classification (ICS): 91.220
Chinese Standard Classification (CCS): P 97
Prefix CECS: association standard of the engineering construction sector, adopted voluntarily.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
How to Download CECS 372-2014
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
CECS 147-2016 — Technical specification for soil mass with reinforced cement soil pile and anchors
CECS 242-2016 — Technical specification for strengthening concrete structures with grid rebar and mortar
CECS 27-2016 — Technical specification for cement castable refractories construction in winter of industrial furnaces
CECS 372-2014
$465.00