CECS 362-2014Technical specification for heat-source-tower heat pump system (English PDF)
热源塔热泵系统应用技术规程
This is a limited preview
Buy now to download the full PDF (19 pages)
Need quotation for your management?
Get a formal quotation for CECS 362-2014 in 30 minutes.
Issued by
China Association for Engineering Construction Standardization
Level / Type
National · Mandatory
Issue date
January 23, 2014
Implementation date
April 1, 2014
Scope
CECS 362-2014 is the English-translated version of 热源塔热泵系统应用技术规程.
CECS 362-2014 — This standard applies to the outdoor air as a cold and heat source, the heat source tower for the heat and heat sink device, the use of steam compression heat pump technology for cooling, heating system engineering design, installation and commissioning inspection and acceptance.
Found what you need?
Document preview — CECS 362-2014
National Standard of the People's Republic of China
- ICS
- 91.140.10
- Classification
- P 46
Issued by: China Association for Engineering Construction Standardization
Contents
- 1 General Provisions
- 2 Terms
- 3 Main Equipment and Materials
- 3.1 Heat Source Tower
- 3.2 Heat-source-tower Heat Pump Units
- 3.3 Solution Concentration Device
- 4 System Design
- 4.1 General Requirements
- 4.2 Design and Selection of Heat-source-tower
- 4.3 Design and Selection of Heat-source-tower Heat Pump Units
- 4.4 Design and Selection of Solution Concentration Device
- 4.5 Design and Selection of Pipeline Systems and Materials
- 5 Construction and Installation
- 5.1 General Requirements
- 5.2 Construction Preparation
- 5.3 Installation
- 6 Testing and Acceptance
- 6.1 General Requirements
- 6.2 Testing of Equipment
- 6.3 Testing of System
- 6.4 Acceptance of Engineering
- 7 Operation and Maintenance
1 Foreword
CECS 362-2014 was issued by China Association for Engineering Construction Standardization on 23 January 2014 and has been in force since 1 April 2014.
It replaces the earlier edition CECS 362-2013.
1.0.1 This specification is formulated to implement energy conservation and emission reduction policy with regard to buildings, make heat-source-tower heat pump system advanced in technology, economic and reasonable, safe and applicable, and guarantee engineering quality.
1.0.2 This specification is applicable to design, construction and installation, testing and acceptance for the system engineering for cooling and heating through vapour-compression heat pump technology by relying on outdoor air as the cold/heat source and heat source tower as the heat extraction & removal device. The heat-source-tower heat pump system is applicable to the region where the outdoor-calculated air dry bulb temperature in winter is 2℃~8℃.
1.0.3 Design, construction and installation, testing and acceptance of the heat-source-tower heat pump system shall meet not only those specified in this specification, but also the requirements of relevant current national standards.
2 Scope Preview
This standard applies to the outdoor air as a cold and heat source, the heat source tower for the heat and heat sink device, the use of steam compression heat pump technology for cooling, heating system engineering design, installation and commissioning inspection and acceptance. The heat source tower heat pump system is suitable for winter outdoor air dry bulb temperature in the area of ??2°C ~ -8°.
CECS 362-2014 falls under ICS 91.140.10, in the field of construction materials and building.
This catalogue holds 144 other CECS standards in that field.
In this catalogue, CECS standards carry edition years from 1988 to 2016.
3 About this standard
Issued by: China Association for Engineering Construction Standardization
English translation: about 19 pages
Chinese original: about 28,234 characters
4 Related standards
Other editions:
CECS 362-2013 (earlier edition)
Standards on related subjects:
GB/T 21087-2020 — Energy recovery ventilators for outdoor air handling
CJ/T 395-2012 — Gas-fired heating and hot water condensing combi-boilers
GB 25034-2010 — Gas-fired heating and hot water combi-boilers
CECS 424-2016 — Technical specification for application of pre-grooved insulation board floor radiant heating
CECS 433-2016 — Technical specification for construction of capillary mat heating and radiant cooling system
5 Classification and status
International classification (ICS): 91.140.10
Chinese Standard Classification (CCS): P 46
Prefix CECS: association standard of the engineering construction sector, adopted voluntarily.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 19 pages — is available in the English PDF.
How to Download CECS 362-2014
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
CECS 147-2016 — Technical specification for soil mass with reinforced cement soil pile and anchors
CECS 242-2016 — Technical specification for strengthening concrete structures with grid rebar and mortar
CECS 27-2016 — Technical specification for cement castable refractories construction in winter of industrial furnaces
CECS 362-2014
$470.00