Valid

CECS 285-2011Technical specification for village landscape environmental engineering (English PDF)

村庄景观环境工程技术规程

Preview PDF

This is a limited preview

Buy now to download the full PDF (37 pages)

Need quotation for your management?

Get a formal quotation for CECS 285-2011 in 30 minutes.

Issued by

China Association for Engineering Construction Standardization

Level / Type

National · Mandatory

Issue date

February 21, 2011

Implementation date

May 1, 2011

Scope

CECS 285-2011 is the English-translated version of 村庄景观环境工程技术规程.

CECS 285-2011 — This standard applies to the village landscape and environmental projects.

Found what you need?

Document preview — CECS 285-2011

National Standard of the People's Republic of China

ICS
91.020
Classification
P 50

Issued by: China Association for Engineering Construction Standardization

Contents

  • [Preview only]
  • 1 General Provisions
  • 2 Terms and Symbols
  • 2.1 Terms
  • 2.2 Symbols
  • 3 Materials
  • 3.1 General Requirements
  • 3.2 Determination of Estimated Strength of Concrete with Dilled Cores
  • 3.3 Drilled Core Correction Method
  • 4 Major Equipments
  • 4.2 Tension Cable and Anchor
  • 4.3 Load
  • 4.4 Detailing requirements
  • 4.5 Artificial Filling Foundation Treatment by Heavy Tamping
  • 5 Structural Calculation
  • 5.2 Analysis of Initial State of Form
  • 5.3 Analysis of Effects under Loads
  • 5.4 Analysis of Pattern Cutting
  • 5.5 Construction Quality Control and Monitor
  • 5.6 Environmental Protection
  • 6 Processing of Core or Technical Requirements of Specimen
  • 6.2 Connection between Membrane Materials
  • 6.3 Connection between Membrane and Rigid Boundary
  • 6.4 Connection between Membrane and Flexible Boundary
  • 6.5 Painting
  • 7 Test of Core Specimen and Calculation of Compressive Strength
  • 7.2 Inspection items
  • 7.3 Qualification judgment
  • 7.4 Maintenance
  • 8 Erection
  • 8.1 Erection of Steel Members and Tension Cables
  • 8.2 Erection of Membrane Elements
  • 8.3 Application of Pretension Force
  • 8.4 Nondestructive Testing of Connection of Structural Steel Casting
  • 8.5 Marking, Storage and Transport
  • 9 Acceptance

1 Foreword

CECS 285-2011 was issued by China Association for Engineering Construction Standardization on 21 February 2011 and has been in force since 1 May 2011.

The CECS prefix marks a association standard of the engineering construction sector, adopted voluntarily.

The document runs to 37 pages in English translation.

2 Scope Preview

This standard applies to the village landscape and environmental projects.

CECS 285-2011 falls under ICS 91.020, in the field of construction materials and building.

This catalogue holds 144 other CECS standards in that field.

In this catalogue, CECS standards carry edition years from 1988 to 2016.

3 About this standard

Issued by: China Association for Engineering Construction Standardization

English translation: about 37 pages

Chinese original: about 55,587 characters

4 Related standards

Standards on related subjects:

GB/T 16311-2024 — Specification and test method for road traffic markings

CECS 402-2015 — Standard for operation management of urban underground space

CECS 401-2015 — Standard for development construction management of urban underground space

5 Classification and status

International classification (ICS): 91.020

Chinese Standard Classification (CCS): P 50

Prefix CECS: association standard of the engineering construction sector, adopted voluntarily.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 37 pages — is available in the English PDF.

How to Download CECS 285-2011

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Fast delivery

    After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
37 pages
Fast delivery
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

CECS 285-2011

$470.00