CECS 279-2010Technical specification for ground treatment by heavy tamping (English PDF)
强夯地基处理技术规程
This is a limited preview
Buy now to download the full PDF (46 pages)
Need quotation for your management?
Get a formal quotation for CECS 279-2010 in 30 minutes.
Issued by
China Association for Engineering Construction Standardization
Level / Type
National · Mandatory
Issue date
August 16, 2010
Implementation date
November 1, 2010
Scope
CECS 279-2010 is the English-translated version of 强夯地基处理技术规程.
CECS 279-2010 — Technical specification for ground treatment by heavy tamping
Found what you need?
Document preview — CECS 279-2010
National Standard of the People's Republic of China
- ICS
- 91.060.10
- Classification
- P 22
Issued by: China Association for Engineering Construction Standardization
Contents
- 1 General Provisions
- 2 Terms and Symbols
- 2.1 Terms
- 2.2 Symbols
- 3 Basic Requirement
- 4 Design
- 4.1 General Requirement
- 4.2 Heavy Tamping
- 4.3 Dynamic Replacement
- 4.4 Special Soil Foundation Treatment by Heavy Tamping
- 4.5 Artificial Filling Foundation Treatment by Heavy Tamping
- 5 Construction
- 5.1 General Requirement
- 5.2 Preparation of Construction Site
- 5.3 Construction Machine
- 5.4 Construction Procedure
- 5.5 Construction Quality Control and Monitor
- 5.6 Environmental Protection
- 6 Quality Test and Acceptance
- 6.1 Quality Test and Acceptance of Heavy Tamping
- 6.2 Quality Test and Acceptance of Dynamic Replacement
1 Foreword
CECS 279-2010 was issued by China Association for Engineering Construction Standardization on 16 August 2010 and has been in force since 1 November 2010.
1.0.1 This specification was formulated with a view to enhancing design, construction and quality test of ground treatment by heavy tamping, implementing the national technical and ecnomic policies, and achieving technical advancement, safety and usability, economy rationality and high quality and environmental protection.
1.0.2 This specification is applicable to design, construction and quality test of ground treatment by heavy tamping, including natural foundation, artificial filling foundation and special soil foundation.
1.0.3 Ground treatment by heavy tamping shall satisfy such principles as adjusting measures to local conditions, using local materials and saving resources.
1.0.4 Engineering of ground treatment by heavy tamping shall not only meet the requirements of this specification, but also comply with those specified in the current relevant national standards.
2 Scope Preview
This standard applies to natural ground, artificial fill foundation design and special land-based Dynamic Compaction processing, construction and quality testing.
CECS 279-2010 falls under ICS 91.060.10, in the field of construction materials and building.
This catalogue holds 144 other CECS standards in that field.
In this catalogue, CECS standards carry edition years from 1988 to 2016.
3 About this standard
Issued by: China Association for Engineering Construction Standardization
English translation: about 46 pages
Chinese original: about 69,694 characters
4 Related standards
Standards on related subjects:
GB 55001-2021 — Unified standard for reliability design of engineering structures
GB 50005-2017 — Standard for design of timber structures
GB 50202-2002 — Code for acceptance of construction quality of building foundation
CECS 147-2016 — Technical specification for soil mass with reinforced cement soil pile and anchors
CECS 86-2015 — Concrete water tank on Weak Foundation Design Code
5 Classification and status
International classification (ICS): 91.060.10
Chinese Standard Classification (CCS): P 22
Prefix CECS: association standard of the engineering construction sector, adopted voluntarily.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 46 pages — is available in the English PDF.
How to Download CECS 279-2010
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
CECS 147-2016 — Technical specification for soil mass with reinforced cement soil pile and anchors
CECS 242-2016 — Technical specification for strengthening concrete structures with grid rebar and mortar
CECS 27-2016 — Technical specification for cement castable refractories construction in winter of industrial furnaces
CECS 279-2010
$235.00