CB/Z 215-2008Test method for propeller models in uniform flow in a cavitation tunnel (English PDF)
空泡水筒均匀流螺旋桨模型试验方法
This is a limited preview
Buy now to download the full PDF
Need quotation for your management?
Get a formal quotation for CB/Z 215-2008 in 30 minutes.
Level / Type
Industry · Recommended
Issue date
March 17, 2008
Implementation date
October 1, 2008
Scope
CB/Z 215-2008 is the English-translated version of 空泡水筒均匀流螺旋桨模型试验方法.
CB/Z 215-2008 is the Chinese industry standard "Test method for propeller models in uniform flow in a cavitation tunnel". It was issued on March 17, 2008, and took effect on October 1, 2008. It is in force.
Found what you need?
Document preview — CB/Z 215-2008
Contents
- Document data
1 Document data
Sector: Shipbuilding (industry standard).
Date of issue: 2008-03-17.
Date of implementation: 2008-10-01.
Status: valid.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.
How to Download CB/Z 215-2008
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
CB/Z 343-2019 — Marine hot-dip galvanizing
CB/Z 810-2019 — Evaluation method for dynamic positioning capability of marine engineering equipment
CB/Z 811-2019 — Ocean engineering environment simulation and environmental load forecasting method
CB/Z 215-2008
$195.00